Voltage Ride-Through-Constrained Power Capping for Large-Scale Data Centers
Jie Zhu, Ye Tian, Yinliang
Key points
From the paper's conclusion- Selective power capping achieves approximately 5\% demand reduction during capped periods while satisfying the prescribed VRT requirements.
Abstract
Large-scale data centers may satisfy steady-state network constraints while violating operational limits during voltage disturbances. This paper proposes a voltage ride-through (VRT)-aware power-capping framework that integrates AC optimal power flow scheduling with dynamic ride-through assessment. The proposed dynamic model captures converter limits, DC-link energy dynamics, battery support, and IT-bus voltage response. A simulation-based checker evaluates VRT constraints under prescribed faults, and the power caps are iteratively updated to obtain feasible schedules. Case studies on the IEEE 14-bus system with two data centers demonstrate that steady-state feasible operating points may violate transient voltage and power-import limits. Selective power capping achieves approximately 5\% demand reduction during capped periods while satisfying the prescribed VRT requirements. The results highlight the necessity of incorporating dynamic security assessment into data-center operational limit determination.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Reducing Data-Center Load Transfers with Ride-Through-Aware Voltage ControlarXiv · 2026
- Low-Voltage Ride-Through in AI Data Centers via Coordinated Battery and Computing Load ControlarXiv · 2026
- Data Center Oscillation Isolation and Grid Support: Fundamental Limits and Source-Selective ControlarXiv · 2026
- Assessing Data Center Hosting Capacity Considering Electromagnetic Transient DynamicsarXiv · 2026
- Virtual Transmission Lines from Data Center Workload Migration: Coordinated Multi-Year Transmission Expansion PlanningarXiv · 2026
- Converter-Aware Coordination of Computing Flexibility in Behind-the-Meter Data CentersarXiv · 2026