Optimal Scheduling of Multi-Site AI Data Centers in Day-Ahead Markets
Xinyang Zhou, Guido Cavraro
Key points
From the paper's conclusion- A year-long simulation on 2025 California Independent System Operator (CAISO) day-ahead prices in three data-center markets demonstrates the framework.
Abstract
AI data centers are among the fastest-growing loads on the power grid, and their flexibility is increasingly sought by grid operators. Using it requires a model that links what an operator controls, namely GPU power caps, job timing and job placement, to the power drawn at each site and the electricity prices it faces. This paper develops such a framework for a multi-site AI data-center fleet. It represents GPU power-cap levels; deferrable jobs with deadlines and inference with response-time headroom; and site facility power, and casts the fleet schedule as a linear program solved on day-ahead prices. A year-long simulation on 2025 California Independent System Operator (CAISO) day-ahead prices in three data-center markets demonstrates the framework. Coordinated scheduling lowers the fleet's energy cost by 6.3% at equal work. Four operating modes, each adding one capability, split this saving into efficient GPU operation that needs no price signal, price response in time, and routing work between sites.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Solver-Free and Cost-Aware Online Scheduling of AI Data Center TasksarXiv · 2026
- Quantifying the hosting capacity value of workload flexibility for AI data centers: A two-stage electricity-computation co-optimization frameworkarXiv · 2026
- Unlocking Heterogeneous Accelerator Flexibility in AI Data Centers: Sizing and Workload AllocationarXiv · 2026
- Grid Demand Flexibility Assessment of AI Data Centers via Batch Workload Temporal ShiftingarXiv · 2026
- Coordinating Distributed AI Servers with Industrial Loads to Reduce Grid-Interconnection NeedsarXiv · 2026
- AI Inference-Aware Optimal Power Flow: Converting Token Requirements into Grid FlexibilityarXiv · 2026