From the paper's conclusion- These results show how hardware heterogeneity and workload flexibility jointly shape economical, grid-compliant capacity plans.
Abstract
AI data centers are an emerging electricity demand, but limited local grid capacity could delay their connection and expansion. While existing operational strategies consider spatio-temporal workload flexibility, few studies address the strategic sizing and allocation of diverse accelerator archetypes with different capital and energy-efficiency trade-offs. This paper unlocks the flexibility potential of heterogeneous accelerators by jointly sizing and allocating different AI workloads (training, delay-tolerant batch work, and online inference requests) across sites and hours to meet the time-varying grid constraint at minimum cost. Workload-specific throughput and energy coefficients link these decisions to facility power. In a representative two-site case, heterogeneous sizing reduces daily cost by 6.5% relative to spatio-temporal scheduling with fixed capacity. When evaluated using workload-specific performance, a capacity design based on workload-averaged hardware coefficients costs 7.7% more than the proposed design. The proposed design also eliminates the envelope violations of an unconstrained design at a 0.25\% daily cost increase. These results show how hardware heterogeneity and workload flexibility jointly shape economical, grid-compliant capacity plans.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Quantifying the hosting capacity value of workload flexibility for AI data centers: A two-stage electricity-computation co-optimization frameworkarXiv · 2026
- Grid Demand Flexibility Assessment of AI Data Centers via Batch Workload Temporal ShiftingarXiv · 2026
- Optimal Scheduling of Multi-Site AI Data Centers in Day-Ahead MarketsarXiv · 2026
- Converter-Aware Coordination of Computing Flexibility in Behind-the-Meter Data CentersarXiv · 2026
- Data center workload flexibility for power system demand response: Evidence from Alibaba tracesInternational Journal of Electrical Power & Energy Systems · 2026
- Scalable Reference Electrical Architectures for Modern Data CentersarXiv · 2026