AI Inference-Aware Optimal Power Flow: Converting Token Requirements into Grid Flexibility
Qianyi Ma, Dawei Qiu, Xiao Liu
Key points
From the paper's conclusion- These models are then incorporated into an AI inference-aware optimal power flow (OPF) that coordinates inference routing and power system operation among DC operators, the transmission system operator, and inference users.
Abstract
The rapid growth, temporal variability, and geographic concentration of electricity demand from artificial intelligence (AI) inference can aggravate transmission congestion near data centers (DCs). The spatial and temporal flexibility of inference workloads offers an opportunity to alleviate this congestion: requests can be routed across DCs or deferred within users' quality-of-service (QoS) requirements. However, inference routing primarily considers graphics processing unit (GPU) availability, leaving this flexibility underused in grid operation. Using GPU measurements, this paper models inference latency and DC power consumption to quantify the flexibility available under users' time-to-first-token (TTFT) and inter-token latency (ITL) requirements. These models are then incorporated into an AI inference-aware optimal power flow (OPF) that coordinates inference routing and power system operation among DC operators, the transmission system operator, and inference users. By linking user requests, token generation at DCs, and electricity delivery through the transmission network, the formulation schedules inference workloads subject to both users' QoS requirements and transmission constraints.Simulations on the PJM system show that, compared with computing-based routing and with electricity price-based routing, coordinating inference routing with network operation enables growing DC electricity demand deliverable to be met at lower cost.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Creating Power Flexibility in Datacenters via Query RoutingarXiv · 2026
- Quantifying the hosting capacity value of workload flexibility for AI data centers: A two-stage electricity-computation co-optimization frameworkarXiv · 2026
- Grid Demand Flexibility Assessment of AI Data Centers via Batch Workload Temporal ShiftingarXiv · 2026
- Online Carbon-Aware Power Flexibility Quantification of Distributed Data CentersarXiv · 2026
- Integrating Data Center Flexibility into Power System Operations: A Framework for Temporal RedispatcharXiv · 2026
- Optimal Scheduling of Multi-Site AI Data Centers in Day-Ahead MarketsarXiv · 2026