From the paper's conclusion- Numerical results based on real GPU cluster traces demonstrate that workload temporal shifting can provide quantifiable and grid-compatible demand flexibility for AI data centers with limited disruption to computing workloads.
Abstract
The rapid growth of artificial intelligence (AI) data centers has introduced new challenges to power system operation. As their power demand becomes larger and more variable, quantitatively characterizing their demand flexibility is increasingly important for effective power system coordination. However, heterogeneous workload characteristics and resource requirements make this flexibility difficult to characterize directly. This paper proposes a framework for assessing the grid-compatible demand flexibility of AI data centers via batch workload temporal shifting. An averaging-based resource usage processing method is developed to map fine-resolution CPU, GPU and memory usage into unified time intervals compatible with power system operation. A workload temporal scheduling model is then formulated to shift batch workloads while preserving execution continuity, delay constraints, and server resource capacities, and is coupled with a utilization-dependent server power model to translate workload scheduling decisions into server power demand. Two complementary flexibility metrics are evaluated: short-term peak demand shaving and the maximum duration of sustained power reduction. Numerical results based on real GPU cluster traces demonstrate that workload temporal shifting can provide quantifiable and grid-compatible demand flexibility for AI data centers with limited disruption to computing workloads.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Quantifying the hosting capacity value of workload flexibility for AI data centers: A two-stage electricity-computation co-optimization frameworkarXiv · 2026
- Data center workload flexibility for power system demand response: Evidence from Alibaba tracesInternational Journal of Electrical Power & Energy Systems · 2026
- Integrating Data Center Flexibility into Power System Operations: A Framework for Temporal RedispatcharXiv · 2026
- AI Data Centers Meet Electrical Grids: A Review of Power Challenges and Coordinated SolutionsarXiv · 2026
- From Flexible Workloads to Verifiable Grid Resources: The Next Phase of Electricity–Computing CoordinationProcesses · 2026
- Mitigating the Grid Impact of Gigawatt-Scale AI Data Centers via High-Fidelity Model FlexibilityarXiv · 2026