Research on Automatic Power Generation Control and Primary Frequency Regulation Parameter Characteristics of Hydropower Units
Yingbin Li, Jian Cheng, Lihua Li, Yousong Shi, Dongfeng Zhang, Yang Zhong, Nan Chen, Xueli An
Yangtze River Pharmaceutical Group (China) · China Institute of Water Resources and Hydropower Research
Key points
From the paper's conclusion- In response to grid disturbances, where Primary Frequency Regulation (PFR) and Automatic Generation Control (AGC) are activated sequentially in actual operation, this paper employs parameter characteristic analysis to systematically investigate the influence of several factors—including turbine operating head, PWM parameters, and governor parameters—on the active power regulation process of hydroe
Abstract
With the increasing integration of variable renewable energy into power systems, the frequency regulation capability of hydroelectric units has become crucial for ensuring grid stability. In response to grid disturbances, where Primary Frequency Regulation (PFR) and Automatic Generation Control (AGC) are activated sequentially in actual operation, this paper employs parameter characteristic analysis to systematically investigate the influence of several factors—including turbine operating head, PWM parameters, and governor parameters—on the active power regulation process of hydroelectric units. The study first compares the response characteristics under different heads and PWM/pulse parameters within the AGC framework. It then examines the effects of pulse duration limits and integral adjustments on guide vane movement and correction efficiency. Finally, under the PFR framework, the impacts of head, steady-state slip coefficient, and integral gain on the amplitude and speed of frequency response are analyzed. Simulation results demonstrate that as the set value of Tkmax increases, the operating range of the guide vane opening within the pulse cycle expands, and the time required for power correction is significantly reduced. Specifically, when Tkmax is increased from 0.2 to 0.55, the regulation time is shortened by 44%. These findings offer theoretical guidance and practical insights for parameter optimization and operational scheduling of hydropower units.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- The regulation and control process of large hydroelectric generating units under PFR-AGC coordinationEngineering Research Express · 2026
- Assessment of primary frequency regulation capability and optimization of guide vane closing law for pumped storage power unitsJournal of Physics: Conference Series · 2026
- From Damping Ratios to Waveform Characteristics: A Residue-Based Mechanistic Analysis Framework for Hydropower Mechanical VariablesMachines · 2026
- Analysis of the External Characteristics of a Hydro-Storage Microgrid Based on P–ω2 Virtual Synchronous ControlProcesses · 2026
- Dominant-Pole-Based Tuning Criterion for Coordinated Needle–Deflector Control in Pelton Turbines for Hybrid Wind–Hydro Power SystemsApplied Sciences · 2026
- Load Frequency Regulation for Thermal Units Integrated with Renewable Energy Sources and Energy Storage SystemsEnergies · 2026