CoSPACE: Coordinated Construction Scheduling, Material Logistics, Shared Storage, and Crew Deployment for Resource-Efficient Site Planning
Suphawut Malaikrisanachalee, Narongrit Wongwai, Wittaya Srisomboon, Phaisan Suphanat
Key points
From the paper's conclusion- Resource-efficient construction planning requires coordination of schedules, material replenishment, limited storage and crew deployment.
Abstract
Resource-efficient construction planning requires coordination of schedules, material replenishment, limited storage and crew deployment. This study develops CoSPACE, a four-layer chromosome and seven-stage engineering decoder that jointly evaluates project duration (PD), material logistics cost (MC) and crew idle exposure (CIE). CIE measures unused capacity within each labour type’s deployment window, avoiding the redundancy between whole-project idle labour and PD under fixed workloads. Thirty seeded search archives are reconstructed for a deterministic ten-activity benchmark, with decoded-plan verification, an earliest-start reference and controlled gene-group interventions. Nine empirical pooled non-dominated points attain the verified 33-day duration bound. MC ranges from 1473.48 to 1662.40 monetary units as CIE decreases from 119 to 67 worker-days. For this benchmark, a selected compromise reduces MC by 21.94% and CIE by 9.41% against the deterministic reference. Controlled replays distinguish inventory, ordering-frequency and mobilization mechanisms; fixing priorities leaves the compromise unchanged, whereas removing delays worsens logistics cost and CIE. A separate matched-budget study evaluates four fixed cases, including two constructed instances and an adapted published project network with hypothetical logistics and non-interchangeable labour. Receipt flexibility improves HV on two cases, and including CIE in selection improves HV on that adapted network after multiplicity correction; no NSGA-II advantage over SPEA2 is established. Storage-floor sensitivity confirms a restricted allocation domain, but no corrected HV difference under the tested budget. These comparisons do not establish field effectiveness. Environmental impacts and uncertain supply require further evidence.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Optimization-Based Scheduling for Rapid Repair of Disrupted Airport PavementsApplied Sciences · 2026
- Genetic Programming for Dynamic Resource Allocation in Construction Projects: A Simulation-Based Case StudyApplied Sciences · 2026
- A discrete-event scheduling framework for structural system selection under crane and crew constraints: application to discuss a hybrid precast buildingArchitecture, Structures and Construction · 2026
- Integrated capacity planning and multi-project scheduling considering resource transfer and idlenessInternational Journal of Production Research · 2025
- Grouping-Driven Production Scheduling Optimization for Precast Concrete ComponentsBuildings · 2026
- AI-Enabled Decision Intelligence for Managing Material Shortages in Engineer-to-Order Supply Chains: A Reproducible Simulation StudyLogistics · 2026