◆ International Journal of Production Research2025-12-01· Capacity planning

Integrated capacity planning and multi-project scheduling considering resource transfer and idleness

Xuejun Hu, Yuhao Wang, Mario Vanhoucke, Zhongbao Zhou, Jianjiang Wang

原始摘要(英文原文)· Original abstract
This paper develops a dual-level framework addressing resource allocation and scheduling challenges in customer-driven production systems involving multi-mode projects with predefined release/due dates. At the tactical level, global resources undergo time-dependent allocation across projects, with transfer costs incurred during dynamic redistribution. Operational-level scheduling utilises these allocations for detailed sub-project execution. The objective minimises total costs encompassing transfer, idle, and indirect expenses. To streamline resource transfers, we introduce a novel ‘blocking’ strategy that partitions time-varying allocations into distinct ‘resource blocks’. We propose an adaptive large neighbourhood search (ALNS) and genetic algorithm (GA) featuring a ‘project macro-mode – activity sequence – activity mode’ hybrid encoding that integrates operational objectives within the tactical framework. Numerical studies confirm the superiority of ALNS, demonstrating it achieves 92% faster computation than CPLEX on small-scale instances while maintaining only a 0.47% optimality gap, reduces costs by up to 13.2% versus GA across 80 test instances, and shows particularly high efficacy in resource-constrained scenarios. The framework demonstrates significant potential for application in complex manufacturing environments like engineer-to-order and make-to-order production, directly contributing to reduced lead times, lower costs, and improved system throughput. Sensitivity analysis provides actionable insights on cost-drivers for production and project management practitioners.
读原文 · Read the paper ↗

AI 追问PRO

登录后使用 AI 追问

讨论区

登录后参与讨论

相关论文 · Related

Integrated capacity planning and multi-project scheduling considering resource transfer and idleness — 科研速览 Science Skim