Optimization-Based Scheduling for Rapid Repair of Disrupted Airport Pavements
Jiawei She, Wei Xu, Zijian Deng
Key points
From the paper's conclusion- The findings support computational decision-making for airport pavement repair, subject to calibration and field validation.
Abstract
Sudden localized pavement damage can disrupt airport operations and create substantial delay costs. This study models repair scheduling as a two-level planning–execution problem that extends the multi-mode resource-constrained project scheduling problem with crew and equipment limits, precedence, release times, transfer-path occupancy, and evolving obstacles. A constraint programming–simulation collaborative framework (CSC-SF) combines CP-SAT constraint-programming planning with deterministic spatiotemporal execution evaluation. Across 90 synthetic benchmark instances, CSC-SF yields the lowest mean simulated repair-completion time (195.45 min) among five compared algorithms and the best or tied-best result on 82 instances. Compared with the one-shot CP-SAT baseline (BASE), CSC-SF achieves a 30.54 min lower mean simulated makespan; all four prespecified pairwise comparisons with the external baselines are statistically significant after global Holm adjustment. On three small instances, 40 s solutions match the incumbents found in 4 h reference runs; independently optimized planning-relaxation lower bounds yield a posteriori relative optimality-gap upper bounds of 0.30–0.80% under the modeled planning-to-execution relationship. Adding selected bottleneck resource groups reduced mean simulated makespan by approximately 14–26 min in the tested engineering scenarios, and fixed-parameter sweeps describe sensitivity to travel speed and processing time. The findings support computational decision-making for airport pavement repair, subject to calibration and field validation.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Stability-Aware Constraint Programming for Emergency Rescheduling of Airport Apron Ground-Support OperationsMathematics · 2026
- Progressive Lower Bound Evaluation for Urban Road Renovation SchedulingarXiv · 2026
- A spatiotemporal graph-based robust optimization framework for data-driven disaster recovery schedulingFrontiers in Earth Science · 2026
- Stochastic Corridor–Time Network Capacity Planning for Low‐Altitude Airspace SystemsNetworks · 2026
- An expert-informed multi-scale synthetic benchmark dataset for calendar-aware resource-constrained project scheduling (CA-RCPSP).Data in brief · 2026
- BOLT: Multi-Bottleneck Bound-Guided Learning for Flexible Job-Shop Scheduling with Time Lags and Resource-Coupled TransportarXiv · 2026