Grouping-Driven Production Scheduling Optimization for Precast Concrete Components
Junyong Liang, Shicen Liu, Yongzhong Zhang, Yu Fu, Baigang Du
Key points
From the paper's conclusion- In a real industrial order experiment with 87 components, the algorithm notably outperforms the comparison algorithms across comprehensive convergence metrics such as hypervolume and inverted generational distance, confirming its favorable practical application potential for balancing pallet resource consumption and flow cycle.
Abstract
Precast component production is an important part of industrialization in construction. However, in actual production, it often faces problems such as high resource occupation, long production cycles, and high delivery costs caused by unreasonable scheduling arrangements. This study proposes a hybrid multi-objective optimization framework that combines Q-learning with the non-dominated sorting genetic algorithm, termed QL-NSGA-II, to address the highly coupled problem of component grouping on pallets and production scheduling in precast component manufacturing. The model aims to collaboratively minimize the number of pallets used, the makespan, and the penalty cost. The algorithm constructs a dual Q-table Markov decision architecture, in which the agent adaptively coordinates PC component grouping and scheduling strategies based on reward feedback from the evolutionary state. Through extreme-value tests on multiple benchmark instances from the literature, the results show that the proposed QL-NSGA-II not only achieves the accuracy of the benchmark solutions, but also, in some cases, reduces the makespan and penalty cost by 34.77% and 60.24%, respectively, compared with existing benchmark algorithms. In a real industrial order experiment with 87 components, the algorithm notably outperforms the comparison algorithms across comprehensive convergence metrics such as hypervolume and inverted generational distance, confirming its favorable practical application potential for balancing pallet resource consumption and flow cycle.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Balancing Efficiency and Ergonomics-Aware Pallet Layout Optimization in Precast Concrete ProductionBuildings · 2026
- Automated generation of assembly schedules for precast building projects under uncertainty using reinforcement learning and Monte Carlo samplingAdvanced Engineering Informatics · 2026
- A Tri-Stage Cooperative Optimization Algorithm With Q-Learning Mechanism for the Multiobjective Distributed Flexible Job Shop Scheduling With Worker FactorsIEEE Transactions on Systems Man and Cybernetics Systems · 2026
- AI-Enabled Decision Intelligence for Managing Material Shortages in Engineer-to-Order Supply Chains: A Reproducible Simulation StudyLogistics · 2026
- CoSPACE: Coordinated Construction Scheduling, Material Logistics, Shared Storage, and Crew Deployment for Resource-Efficient Site PlanningSustainability · 2026
- Applications of classical and quantum machine learning in manufacturing: predictive maintenance, scheduling and tribologyNext research. · 2026