Two-Layer HVDC Frequency Coordination with Local Energy Constraints and Planned Support Withdrawal
Fan Li, Jishuo Qin, Yuan Si, Binqi Ma, Shujun Xin, Dan Wang
Key points
From the paper's conclusion- A causal regional linear program allocates support over time and constrains the frequency response after the scheduled withdrawal; its feasibility condition is derived in terms of the remaining source energy, and late calculations or expired instructions revert to local frequency response.
Abstract
Finite-energy frequency support through multiple high-voltage direct-current (HVDC) links requires coordination of power delivery, device constraints, and support withdrawal, because maximizing the initial response can exhaust a source too early or deepen the frequency minimum after support ends. This paper develops a two-layer method that separates the energy supplied to a synchronous system by asynchronously connected sources from the power redistributed inside it by embedded links. A local scalar projection enforces the present source and capacitor constraints at every converter, with explicit conditions for discrete invariance, bounded-error sampled execution, finite-rate withdrawal, and the capacitor discharge time. A causal regional linear program allocates support over time and constrains the frequency response after the scheduled withdrawal; its feasibility condition is derived in terms of the remaining source energy, and late calculations or expired instructions revert to local frequency response. In a two-area benchmark with 900 MJ of source energy and a 20 MW internal transfer limit, 5 Hz coordination reduces the maximum frequency depression by 17.38% and 13.83% relative to independently searched static gains, and three-phase average-value electrical realization retains 16.57% and 13.25%. In 70 newly executed plant-perturbation cases with load damping, governor, secondary, inertia, and tie-line parameters varied by up to 20%, the controller improves on fixed droop in every case and on the searched static gains in 63, without device-limit violations; in a three-area extension with three stations the reductions are 6.60% to 17.55% relative to searched static gains and 38.04% to 42.05% relative to fixed droop. Measured calculation times identify the linear program as the only real-time bottleneck and quantify how its size grows with the number of areas and stations.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Frequency-Support Capability Verification of Multiple VSC-HVDC Links Through Power–Energy–Duration Envelopes and Shared-Resource De-DuplicationElectronics · 2026
- A Two-Layer Distributed Event-Triggered Active Frequency and Voltage Control Framework for HVDC-Connected Wind FarmsElectronics · 2026
- Control of multiple parallel HVDC systems for frequency response sharing: A study based on synchronous frequency operation of the asynchronously interconnected systems in ChinaInternational Journal of Electrical Power & Energy Systems · 2026
- Damping-Constrained Allocation of Frequency-Support Gains for Multiple VSC-HVDC Systems in a Synchronous Grid Using Port-Coupling Matrices and Safe Gain MapsElectronics · 2026
- Coordinated Fault Ride-Through Control for a Hierarchically Connected VSC-HVDC SystemEnergies · 2026
- Dispatch-Preserving Capability-Aware Coordination of Distributed Grid-Forming Hybrid Energy Storage in Active Distribution NetworksElectronics · 2026