Optimizing construction risk management through BIM integration and strategic planning
Ruixin Li, Reem A. Almenweer, Haytham F. Isleem, Ahmed Sayed M. Metwally
Dalian Neusoft University of Information · Damascus University
Key points
From the paper's conclusion- The results of the experiment show a high level of predictive performance with an accuracy of 98.88% and close-to-perfect ROC-AUC metrics, and BIM-based visualization dashboards offer intuitive insights to monitor and manage construction risk efficiently.
Abstract
The construction projects are characterized by intricate relations of cost, schedule, resources, and structural aspects that frequently give rise to uncertainty and project risk. In order to overcome these difficulties, this research suggests a Hybrid Construction Intelligence Framework Network (HCIF-Net) of intelligent construction risk management through combining the BIM data with predictive analytics and hybrid optimization methods. Several heterogeneous datasets, such as records of construction project management, project reports, and IFC-based BIM structural data, are incorporated to form a unified dataset of 1300 project instances. SMOTE balancing is used after the preprocessing and feature engineering to deal with class imbalance in risk categories. The HCIF-Net framework integrates TabNet to learn tables, Bayesian Network to model probabilistic risks dependencies, Temporal Attention LSTM to predict sequential progress, and Monte Carlo simulation to analyse uncertainty. A hybrid MILP-NSGA-II optimization model is employed to reduce the project cost, the time taken to complete, and the total risk to aid decision-making. The results of the experiment show a high level of predictive performance with an accuracy of 98.88% and close-to-perfect ROC-AUC metrics, and BIM-based visualization dashboards offer intuitive insights to monitor and manage construction risk efficiently.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Utilization of Building Information Modeling (BIM) for mitigating construction risksJournal of Engineering and Applied Science · 2026
- AI-Driven Optimization of Scheduling, Risk, and Sustainability in BIM-Enabled Construction Project ManagementArabian Journal for Science and Engineering · 2026
- A BIM‐Based Probabilistic Approach for Risk Assessment in Construction ProjectsAdvances in Civil Engineering · 2026
- Assessing the impact of AI-enabled BIM digital twins on construction risks: a Bayesian Network of Jordanian expert beliefs.Frontiers in artificial intelligence · 2026
- Artificial Intelligence in Construction Management Enhancing Decision Making A cross a Project Life Cycle: throught A Machine Learning MethodTurkish Journal of Engineering · 2026
- Risk prioritization in construction projects as a governance problem: a hierarchical, explainable, and uncertainty-aware decision frameworkInternational Journal of Construction Management · 2026