Artificial Intelligence in Construction Management Enhancing Decision Making A cross a Project Life Cycle: throught A Machine Learning Method
Nedjwa Elafri, Abdallah Lalmi, Badr-Eddine BOUMALI, Koudoua Ferhati
Université Constantine 2 · Consortium for Research in Automatic and Telecommunications
Key points
From the paper's conclusion- Case studies demonstrate AI’s capabilities: 98.7% accurate cost estimation, 94.36% delay prediction via deep learning, and 97% safety monitoring with computer vision.
Abstract
The construction industry, which creates 13% of the world’s GDP, suffers from cost overruns of 28% and delays of over 42%, yet is still undigitized. AI has the promise of transforming management in the areas of cost, time and safety. This research provides a systematic review of AI applications and performs an original machine learning analysis on seven algorithms, i.e., Support Vector Machines, Logistic Regression, K-Nearest Neighbors, Random Forest, Stacking Ensemble, Artificial Neural Networks, and XGBoost on 139 Indian road projects with 44 risk factors. XGBoost performed the best with 82.50% accuracy and 84.21% F1-score. The most important concerns were the delay in decision-making (0.152), cash flow problems (0.082) and cost underestimate (0.071). Case studies demonstrate AI’s capabilities: 98.7% accurate cost estimation, 94.36% delay prediction via deep learning, and 97% safety monitoring with computer vision. These findings underscore the importance of ensemble ML in proactive, data-driven risk management, bringing projects into a predictive framework rather than reactive.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Mapping the state-of-the-art: bibliometric and systematic analysis of machine learning and AI-based cost and time prediction in constructionJournal of Asian Architecture and Building Engineering · 2026
- AI-Driven Optimization of Scheduling, Risk, and Sustainability in BIM-Enabled Construction Project ManagementArabian Journal for Science and Engineering · 2026
- Optimizing construction risk management through BIM integration and strategic planningScientific Reports · 2026
- Application of Machine Learning in Predicting Project Cost Overruns: A ReviewJURNAL TEKNIK SIPIL CENDEKIA (JTSC) · 2026
- Exploring artificial intelligence applications in construction using a black grey white box approach for predicting project schedule performance in IndiaDiscover Computing · 2025
- Unraveling the impact of machine learning on the AEC sector: academia and industry perspectivesArchitectural Engineering and Design Management · 2026