Key points
From the paper's conclusion- Starting on page 735 this issue focuses on experience gained so far during the project. (Photo: Wolfgang Gollmayer/Schnittraum)
Abstract
Since 26 August 2026 the first main tunnel tube of the Brenner Base Tunnel is continuously passable after the final breakthrough. The BBT extends for approx. 55 km from the Sill Gorge near Innsbruck to Franzensfeste in South Tyrol. The photo shows the final breakthrough of TBM “Wilma” in the Western tube of the BBT. Starting on page 735 this issue focuses on experience gained so far during the project. (Photo: Wolfgang Gollmayer/Schnittraum)
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- The Brenner Base Tunnel – A European vision, strategic transformation, and a sustainable corridor through the AlpsGeomechanics and Tunnelling · 2026
- Structural project optimisations on the Brenner Base Tunnel – Approaches from planning and executionGeomechanics and Tunnelling · 2026
- TBM–rock mass interaction during tunnelling through a fault zone in the Brenner Base Tunnel: Insights from gripper extension measurementsGeomechanics and Tunnelling · 2026
- Risk management and TBM performance analysis: insights from the Italian section of the Brenner Base TunnelGeomechanics and Tunnelling · 2026
- The geology of the Brenner Base Tunnel and its geological‐geotechnical key sectionsGeomechanics and Tunnelling · 2026
- Precision surveying and innovative material performance in the Brenner Base TunnelGeomechanics and Tunnelling · 2026