Geomechanics and Tunnelling

Structural project optimisations on the Brenner Base Tunnel – Approaches from planning and execution

Romed Insam, Ulrich Burger, Matthias Hofmann, Angelo Lombardi, Michele Ianeselli

Key points

From the paper's conclusion
  • In the course of the planning and execution of the Brenner Base Tunnel (BBT), various structural project optimisations were developed and implemented based on logistical and constructional considerations as well as requirements for the future operational phase.

Abstract

In the course of the planning and execution of the Brenner Base Tunnel (BBT), various structural project optimisations were developed and implemented based on logistical and constructional considerations as well as requirements for the future operational phase. Compared to other long tunnel structures, the BBT has the advantage that – in addition to the two main tunnel tubes intended for train traffic – a third tube is integrated into the overall tunnel system. This third tube initially functions as an exploratory and logistics tunnel and, in the later operational phase, serves as a service BBT on the Austrian and Italian project sides was developed between 2005 and 2008 and submitted to the respective national authorities for approval. In the meantime, just over 220 km of a total of approx. 230 km of tunnel structures have been excavated and partially completed in terms of civil works. Already during and after the approval procedures, as well as during the execution phase, the tunnel system has been continuously optimised on both project sides, significantly simplifying it compared to the approved project. In the present article, the boundary conditions, the approach, and the implementation of various project optimisations are outlined using selected examples from the period between 2005 and today.

Read the paper

Discussion

Science Skim's AI key points, plus readers' public thoughts

Readers' thoughts

No reader thoughts yet.

Related papers

Structural project optimisations on the Brenner Base Tunnel – Approaches from planning and execution — Science Skim