Geomechanics and Tunnelling

Risk management and TBM performance analysis: insights from the Italian section of the Brenner Base Tunnel

David Marini, Enrico Maria Pizzarotti, Santina Bellini, Giuseppe Venditti, Marco Loffredo, Ludovica Pizzarotti

Key points

From the paper's conclusion
  • The results demonstrate how systematic TBM data analysis supports geological interpretation, risk assessment, and operational decision‐making in deep mechanized tunnelling.

Abstract

Accurately predicting geological and geomechanical conditions remains a major challenge in mechanized tunnelling, directly affecting TBM design, construction risks, and excavation performance. Construction Lot H61 Mules 2–3 of the Brenner Base Tunnel provides a unique case study, where three Double Shield TBMs (one for Exploratory Tunnel and two for main railway tunnels) excavated under complex Alpine conditions. High‐resolution TBM operational data, including advance speed, penetration, thrust, and cutterhead torque, were systematically analysed and correlated with geological conditions to evaluate machine performance and excavation efficiency. The paper presents the project framework, TBM characteristics, risk management strategy, and data evaluation methodology, with particular emphasis on the comparison between predicted and achieved advance rates and the interpretation of excavation interruptions. The results demonstrate how systematic TBM data analysis supports geological interpretation, risk assessment, and operational decision‐making in deep mechanized tunnelling.

Read the paper

Discussion

Science Skim's AI key points, plus readers' public thoughts

Readers' thoughts

No reader thoughts yet.

Related papers

Risk management and TBM performance analysis: insights from the Italian section of the Brenner Base Tunnel — Science Skim