CMS ECAL VFE Production Qualification
C. Borca, S. Argir\`o, L. T. Bulaja, D. Brunet, F. Cavallari, D. Cristoforetti, G. Dissertori, L. Finco,
Key points
From the paper's conclusion- We have received and functionally tested 13596 unique VFEs; two never passed our test criteria.
Abstract
Upgrading the CMS ECAL barrel for the HL-LHC requires replacement of all on-detector electronics, including 12240 Very-Front-End (VFE) cards employing CATIA and LiTE-DTU ASICs for amplification and digitisation of signals from ECAL's 61200 lead-tungstate crystals. All production VFEs undergo the same qualification procedure: functional testing, environmental stress screening, and calibration. We have received and functionally tested 13596 unique VFEs; two never passed our test criteria. Results for other VFEs are uniform and within expectations, demonstrating the excellent quality of the cards. Key metrics, such as a gain ratio of $10.21 \pm 0.07$ and power consumption of $1.805 \pm 0.013~\mathrm{W}$, demonstrate high consistency across the batch.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Performance Assessment of bPOL12V Power Modules for the Next LHCb-RICH Front-end ElectronicsJournal of Instrumentation · 2026
- CMS ECAL Phase-2 upgrade: characterisation and stability analysis of a three-stage low-voltage power-conversion systemarXiv · 2026
- A cryogenic characterization platform for commercial off-the-shelf (COTS) electronic devices in liquid xenon detectors for high-energy physics experiments.The Review of scientific instruments · 2026
- Test of a partly instrumented highly compact and granular electromagnetic calorimeter in an electron beam of 1–6 GeVThe European Physical Journal Plus · 2026
- Study on light output uniformity of the CEPC-GS-HCAL scintillator detector cellsJournal of Instrumentation · 2026
- Developing the NewAthena X-IFU Cryogenic AntiCoincidence Detector (CryoAC): From Microfabrication Process Standardization to Cryogenic Functional Verification Toward TRL5.Sensors (Basel, Switzerland) · 2026