Generation and Transmission Expansion Planning with BESS-Based Virtual Transmission Lines
Qiushi Wang, Xingpeng Li
Key points
From the paper's conclusion- These results demonstrate the potential of VTL to provide congestion mitigation that complements standalone BESS applications.
Abstract
This paper proposes a mathematical model for long-term Generation and Transmission Expansion Planning (GTEP) that integrates a relaxed Virtual Transmission Line (VTL) as a Storage in Place of Transmission Asset (SIPTA) strategy to address challenges posed by transmission capacity shortages and system congestion in deregulated power markets, particularly under the rapid growth of renewable energy resources and integrated data centers. The proposed VTL formulation coordinates the operation of the two battery energy storage systems (BESSs) forming a VTL pair by preventing them from charging or discharging simultaneously, thereby providing additional congestion relief without introducing an explicit congestion cost into the objective function. Base case studies on a revised IEEE 24-bus system demonstrate that VTL reduces system congestion compared with the standalone BESS case, achieving a 12.3% reduction in weighted total congestion and up to approximately 67% reduction in congestion on individual transmission branches, with only a 0.3% increase in total planning cost. Furthermore, improvements across multiple congestion metrics indicate that the benefits of VTL extend beyond reducing congested line-hours to reducing congestion rent and N-1 transmission violations in the base case. These results demonstrate the potential of VTL to provide congestion mitigation that complements standalone BESS applications.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Virtual Transmission Lines from Data Center Workload Migration: Coordinated Multi-Year Transmission Expansion PlanningarXiv · 2026
- Transmission Expansion Investment Evaluation Considering the Impact of Behind-the-Meter GenerationEnergies · 2026
- Sensitivity Analysis‐Based Transmission System Expansion Planning with Multiple Options for Relieving CongestionIEEJ Transactions on Electrical and Electronic Engineering · 2026
- An adaptive MPEC-based hierarchical framework for Co-optimizing virtual power plant profit and battery energy storage system healthFuture Batteries · 2026
- Trust-Region Benders for Scalable Multiperiod Expansion Planning for Transmission and StoragearXiv · 2026
- Energy-efficient scheduling of low-carbon heterogeneous energy-integrated virtual power plants with 5G base station energy storage participationInternational Journal of Electrical Power & Energy Systems · 2025