Transmission Expansion Investment Evaluation Considering the Impact of Behind-the-Meter Generation
Juan Pablo Rincón Ochoa, Alejandro José Salas, Mario Alberto Rios, Alejandra Tabares, Sergio Cabrales, Paulo M. De Oliveira-De Jesus
Key points
From the paper's conclusion- Applied to the Garver system and the Colombian 500 kV backbone, the methodology shows that the required transmission investment decreases as BTM penetration grows, and that part of it is postponed: in Colombia, a 5% penetration removes 30% of the base plan, and final penetrations of 10% and 20% reduce its present value by 27.5% and 53.7%, respectively.
Abstract
Behind-the-meter (BTM) generation is growing rapidly worldwide. Peak demand can be significantly reduced through the increasing installation of rooftop photovoltaic (PV) systems and battery energy storage systems (BESSs). The rate of this reduction is expected to increase with the quality of the solar resource. Transmission expansion plans can therefore benefit from avoided and deferred investment, which must be properly evaluated. These savings, from infrastructure no longer needed, can be passed on to end users through lower network tariffs. This article presents a new methodology for valuing the transmission investment deferred or avoided by BTM generation. BTM generation is represented as a nodal reduction in annual peak demand in static and multi-period DC mixed-integer linear expansion models, and a BTM Index (BTMI) ranks the nodes (substations) where BTM deployment should be promoted. Applied to the Garver system and the Colombian 500 kV backbone, the methodology shows that the required transmission investment decreases as BTM penetration grows, and that part of it is postponed: in Colombia, a 5% penetration removes 30% of the base plan, and final penetrations of 10% and 20% reduce its present value by 27.5% and 53.7%, respectively.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Generation and Transmission Expansion Planning with BESS-Based Virtual Transmission LinesarXiv · 2026
- Flattening Winter Peaks with Dynamic Energy Storage: A Neighborhood Case Study in the Cold Climate of Ardahan, TurkeySustainability · 2026
- Uncertainty-aware bilevel energy storage planning for active distribution networks: A fixed-topology DistFlow-based MISOCP framework with voltage-security assessment.PloS one · 2026
- Risk-constrained optimization of joint spatio-temporal flexibility of mobile energy storage and data centers under uncertainties in distribution systemsEnergy Reports · 2025
- Sensitivity Analysis‐Based Transmission System Expansion Planning with Multiple Options for Relieving CongestionIEEJ Transactions on Electrical and Electronic Engineering · 2026
- Virtual Transmission Lines from Data Center Workload Migration: Coordinated Multi-Year Transmission Expansion PlanningarXiv · 2026