Buildings

Construction Technology for High-Altitude Piece-by-Piece Assembly of a Large-Span Steel Sky Corridor in a Complex Urban Environment: A Case Study

Kaifa Dong, Zhengxing Guo, Haibin Sun, Taiyu Zhou, Ruichen Yin, Huangyuanqi Wang

Key points

From the paper's conclusion
  • The reported structural and construction checks met the adopted criteria, supporting the feasibility of the proposed method.

Abstract

Steel sky corridors often span operating facilities and roads, while hoisting equipment is confined to a basement roof, making integral hoisting impracticable. Using the Nanjing Jinling Zhonghuan project as a case study, an integrated construction-control framework was developed for high-altitude piece-by-piece assembly. Four hoisting schemes were compared, and a staged finite-element model was used to compare temporary-support removal sequences. A load-transfer system with 24 support points and 48 jacks was designed. The selected scheme, an 80 t crane advancing from the fixed end and closing at the cantilever end, reduced the heaviest hoisting unit from 108 t to about 10 t, avoiding basement-roof strengthening. Removing the cantilever-end support first caused an abrupt 45.25 mm deflection, whereas removing the roof supports first limited the mid-span increment to 25.61 mm. Jacks preloaded to 80% of the computed reaction limited the maximum temporary-support reaction to 398.0 kN at roof level and 493.9 kN at ground level. Laser scanning of 140 nodes resulted in a maximum final-position deviation ratio of 2.94‰, close to the project-specific 3‰ control value. The reported structural and construction checks met the adopted criteria, supporting the feasibility of the proposed method.

Read the paper

Discussion

Science Skim's AI key points, plus readers' public thoughts

Readers' thoughts

No reader thoughts yet.

Related papers