Risk Governance for EPC Contracts with Startup Owners: An Integrated MCDM–Behavioral Framework
Ching-Feng Lee, James J.H. Liou
Key points
From the paper's conclusion- The results show that severity is the most influential risk factor, accounting for 43.5% of the total weight.
Abstract
Large-scale international Engineering, Procurement, and Construction (EPC) projects undertaken for startup owners involve substantial transactional and financial risks that may not be adequately captured by conventional Failure Mode and Effects Analysis (FMEA), which assumes equal weighting of risk factors and rational decision-making. This study develops an integrated risk assessment framework combining the Modified Delphi Method (MDM), Step-wise Weight Assessment Ratio Analysis (SWARA), FMEA, Prospect Theory, and Decision-Making Trial and Evaluation Laboratory (DEMATEL) to identify, weight, behaviorally adjust, and analyze the causal relationships among EPC risks. A large international EPC turnkey project was examined using assessments from seven senior managers, resulting in 25 risk indicators across five dimensions. The results show that severity is the most influential risk factor, accounting for 43.5% of the total weight. Incorporating a prospect-theoretic transformation of the expert ratings alters conventional risk rankings, with owner insolvency, funding-chain disruptions, and liability-cap risks emerging among the nine most critical risks. DEMATEL further identifies Owner Relationship Risk and Contractual Risk as the primary causal dimensions, whereas Financial Risk represents the major outcome dimension. Sensitivity analyses of the criterion weights, prospect-theory parameters and reference point, together with expert-level bootstrapping, indicate that the high-priority risk set is robust, although the exact order within it is less certain. The proposed framework integrates behavioral preferences into EPC risk assessment; because it was validated retrospectively on a completed project, it is proposed as a basis for risk prioritization and bid-stage governance in future prospective applications.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Risk prioritization in construction projects as a governance problem: a hierarchical, explainable, and uncertainty-aware decision frameworkInternational Journal of Construction Management · 2026
- Analysis on the Influencing Factors and Innovation Path of anEPC Project-Transaction Model Based on Value-AddedBuildings · 2026
- A novel hybrid approach for determinants of construction projects failure: An application of Delphi-DEMATEL methodologyResults in Engineering · 2026
- An enhanced FMEA based risk analysis for ship fire safety incorporating the dynamic consensus reaching process with bounded confidence opinion dynamicsOcean Engineering · 2025
- The Interactive Dynamic Social Trust Network-Based Failure Mode and Effect Analysis Method Considering Correlative Cause and Effect Relationships.Risk analysis : an official publication of the Society for Risk Analysis · 2026
- A Systems-Based Framework for Startup Risk Management: Integrating Axiomatic Design, Qualitative Research Synthesis, and Real Options AnalysisSystems · 2026