Centralized and Decentralized Production Planning: A Comparative Study of Scheduling Performance in a Multi-Stage Production System
Krzysztof Żywicki
Key points
From the paper's conclusion- The results showed that departmental performance alone was insufficient to assess the entire production system.
Abstract
Two approaches to production planning were compared in a multi-stage production system and experimentally verified under actual operating conditions at an automotive-industry company. Under centralized planning, a common schedule was prepared for technologically and materially interdependent production orders. Under decentralized planning, individual departments generated and scheduled their own orders from aggregated demand. Forward, backward, and bottleneck-oriented scheduling were applied in both approaches. Order completion times, workstation busy times, due-date performance, and the relationship between departmental and system-wide results were analyzed. In centralized forward scheduling, mechanical processing accounted for the largest share of cumulative workstation busy time (54.87%). In decentralized planning, overall order completion depended on the coordination of local schedules, particularly the availability of components for assembly. The results showed that departmental performance alone was insufficient to assess the entire production system. They also distinguished late completion from the requirement to start production before the permitted release date. The two approaches had different information and coordination requirements, but the results did not establish an unconditional advantage for either approach.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Release date optimisation in MRP using clearing functionsInternational Journal of Production Research · 2026
- Production Planning in the Steel Industry and Its Downstream Manufacturers: A Review of Models and Solution ApproachesMathematics · 2026
- The Production of Service: A Workload View of Complementarity and SubstitutionStochastic Systems · 2026
- Adapting sales and operations planning to engineer-to-order complexity: a multifaceted information processing approach to managing uncertainty and equivocalityInternational Journal of Production Economics · 2026
- Sensitivity of production planning models and integration optimization role in minimizing tardinessRAIRO - Operations Research · 2026
- The Generalized-cμ Rule at a Job-Shop Bottleneck with Family Setups: Analysis, Simulation, and a Setup-Aware VariantAxioms · 2026