Release date optimisation in MRP using clearing functions
Wolfgang Seiringer, Klaus Altendorfer, Reha Uzsoy
University of Applied Sciences Upper Austria · North Carolina State University
Key points
From the paper's conclusion- The proposed optimisation model replaces MRP’s backward scheduling step while preserving its overall structure.
Abstract
This paper integrates a clearing function (CF)-based release planning approach into Material Requirements Planning (MRP) to address its limitations in modelling capacity constraints and dynamic lead times. The proposed optimisation model replaces MRP’s backward scheduling step while preserving its overall structure. Performance is evaluated through simulation experiments on two flow shop systems that explore a range of demand uncertainties and utilisation levels. Computational results show that the proposed approach is capable of yielding significant improvements over the conventional backward scheduling approach, due to its ability to compute planned lead times for individual production orders as opposed to BOM items.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Centralized and Decentralized Production Planning: A Comparative Study of Scheduling Performance in a Multi-Stage Production SystemApplied Sciences · 2026
- On the nature and validity of the clearing functionFrontiers in Applied Mathematics and Statistics · 2026
- Minimum Buffer Capacity for Preserving Performance in Fulfillment SchedulingAlgorithms · 2026
- Information Utilization Strategies Integration-Enhanced Rule Decision Framework for Rule-Based Real-Time Scheduling in Make-to-Order Flexible Job ShopsMachines · 2026
- Multi-Population Backtracking Search Algorithm for Bi-Objective Multi-Product Multi-Stage Batch Scheduling with Fuzzy Processing Times: Minimizing Makespan and Maximizing Customer SatisfactionProcesses · 2026
- NRP-Exp: An Integrated Framework for Reproducible Experiment Management in Multi-Objective Release PlanningInformation · 2026