Exploring artificial intelligence applications in construction using a black grey white box approach for predicting project schedule performance in India
Ajay Tiwari, Aslam Hussain
Rajiv Gandhi Technical University
Key points
From the paper's conclusion- Models were categorized as white box, grey box, or black box based on interpretability.
Abstract
Timely completion of construction projects is vital for cost control, stakeholder satisfaction, and project success. In India, however, schedule adherence is frequently challenged by factors such as resource limitations, weather disruptions, and design changes. This study presents an AI-driven predictive modeling framework to forecast schedule performance using real-world data from Indian construction projects. Five machine learning models—multiple linear regression (MLR), support vector regression (SVR), artificial neural networks (ANN), random forest regressor (RFR), and gradient boosting machine (GBM)—were developed and evaluated. Models were categorized as white box, grey box, or black box based on interpretability. MLR, while transparent, showed limited performance in complex scenarios. SVR and RFR offered a balance between accuracy and explainability, whereas ANN and GBM achieved the highest predictive accuracy. GBM emerged as the top performer (R² = 0.93). Feature importance and sensitivity analyses identified planned duration, workforce size, equipment utilization, and material availability as key drivers of schedule adherence. The findings provide actionable insights for selecting suitable AI models in construction planning and underscore the value of integrating predictive analytics into schedule risk management for Indian infrastructure projects.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Artificial Intelligence in Construction Management Enhancing Decision Making A cross a Project Life Cycle: throught A Machine Learning MethodTurkish Journal of Engineering · 2026
- AI-Driven Optimization of Scheduling, Risk, and Sustainability in BIM-Enabled Construction Project ManagementArabian Journal for Science and Engineering · 2026
- Mapping the state-of-the-art: bibliometric and systematic analysis of machine learning and AI-based cost and time prediction in constructionJournal of Asian Architecture and Building Engineering · 2026
- Critical drivers of artificial intelligence (AI) adoption in construction projects: evidence from a developing economyInternational Journal of Construction Management · 2026
- Exploring Critical Success Factors of AI-Integrated Digital Twins on Saudi Construction Project Deliverables: A PLS-SEM ApproachBuildings · 2025
- An Integrated ML-Lean-BIM framework for prediction of construction duration in metro projectIOP Conference Series: Earth and Environmental Science · 2026