Research on Intelligent Manufacturing Production Line Scheduling Optimization Based on Improved Gray Wolf Optimization Algorithm
Yijia Xu, Jindong Zhao, Yicheng Xu, Shuocheng Sun, Zhe Yang
Key points
From the paper's conclusion- This study proposes QM‐IGWO, a Q‐learning–driven multistrategy collaborative improved gray wolf optimizer.
Abstract
Intelligent manufacturing production line scheduling is formulated as a flexible job shop problem that minimizes the makespan and the total energy consumption. The classical gray wolf optimizer handles this problem poorly because its continuous update does not match the discrete schedule, and it also suffers from random initialization, a fixed local search and late stagnation. This study proposes QM‐IGWO, a Q‐learning–driven multistrategy collaborative improved gray wolf optimizer. Random keys map every wolf to a feasible operation sequence and machine assignment, and an NEH insertion adapted to the flexible job shop seeds both strings. A Q‐learning agent observes the Hamming diversity of the decoded strings and the stagnation level, selects one of four neighborhoods for a local search on the three leaders, and shares the stagnation signal with a selective restart that keeps the Q‐table and an external archive of nondominated schedules. On the Brandimarte benchmark, QM‐IGWO shortens the mean makespan of the classical optimizer by 11.1% and matches or improves the best makespans of a recent hybrid gray wolf optimizer on all ten instances with less than one‐sixth of its evaluation budget. It also leads on the three Hurink subsets, raises the hypervolume by 14.2% over the classical optimizer and by 5.3% over a recent Q‐learning gray wolf optimizer, and shortens the makespan of two automotive parts production lines by 12.3% and 13.1% with about 10% less energy. Holm‐corrected Wilcoxon tests find it significantly better on 94% of the instance‐baseline pairs and never worse.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- An Improved MOEA/D Algorithm for Multi-Objective Green Flexible Job Shop Scheduling ProblemProcesses · 2026
- Knowledge-Guided Multi-Objective Evolutionary Algorithm for Energy-Efficient Integrated Process Planning and Scheduling with Variable Processing SpeedsMachines · 2026
- Hybrid Grey Wolf Optimizer with discrete prism dispersion strategy for solving flexible job-shop scheduling problemScientific Reports · 2026
- Learning-Augmented Energy Digital Twin of a Flexible Manufacturing Line: Data-Driven Surrogates and a Multi-Layered Grey Wolf Optimizer for Bottleneck-Aware Decision SupportAI · 2026
- A Tri-Stage Cooperative Optimization Algorithm With Q-Learning Mechanism for the Multiobjective Distributed Flexible Job Shop Scheduling With Worker FactorsIEEE Transactions on Systems Man and Cybernetics Systems · 2026
- An improved whale optimization algorithm for flexible job shop scheduling problems with machine deterioration effectsScientific Reports · 2026