Hybrid Grey Wolf Optimizer with discrete prism dispersion strategy for solving flexible job-shop scheduling problem
Ying Duan, Luyi Shi, Mingyang Li, Kangmin Hua, Ting Liu, Lijun He
Zhengzhou University of Aeronautics · People's Hospital of Xinjiang Uygur Autonomous Region
Key points
From the paper's conclusion- We conduct a comprehensive evaluation of the proposed model through benchmark experiments on three widely used datasets—MK, Kacem, and Lawrence instances.
Abstract
The Flexible job-shop scheduling problem (FJSP) is a quintessential NP-hard problem in the field of production scheduling. With the development of intelligent manufacturing industry, minimizing the total completion time in workshops has become a crucial research focus. Swarm intelligence algorithms have been widely used to solve the FJSP. However, they still suffer from issues such as premature convergence and a tendency of trapping in local optimum. In addition, as iterations increase, the basic parameters of the algorithm still need to be flexibly adjusted. To address these challenges, we propose a hybrid grey wolf optimization algorithm incorporating a discrete prism dispersion strategy (HGWO-DPDS). Inspired by the optical dispersion of light through a prism, this strategy simulates a multi-directional refraction process to diversify the population and improve global exploration. First, in the position update stage, a critical-path-guided mechanism is introduced in the operation sequencing stage to identify and perturb bottleneck operations, while in the machine selection stage, machine-guided convergence enhances the search toward the current best solution. Secondly, the prism-inspired dispersion strategy expands the search directions through multiple reference centers. Finally, an adaptive mutation operator is applied to maintain population diversity and avoid stagnation. We conduct a comprehensive evaluation of the proposed model through benchmark experiments on three widely used datasets—MK, Kacem, and Lawrence instances. HGWO-DPDS is compared with several existing algorithms. The experimental results demonstrate that the proposed framework achieves near-optimal makespan values on most instances, while maintaining stable and reliable performance in solving the FJSP, particularly excelling at escaping local optima compared to existing methods.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- A Dual-Loop Multi-Strategy Migrating Birds Optimization Algorithm for Flexible Job Shop Scheduling in Power Grid Inspection BasesAlgorithms · 2026
- An Improved MOEA/D Algorithm for Multi-Objective Green Flexible Job Shop Scheduling ProblemProcesses · 2026
- An improved whale optimization algorithm for flexible job shop scheduling problems with machine deterioration effectsScientific Reports · 2026
- Research on the Flexible Job Shop Scheduling Problem with Job Priorities Considering Transportation Time and Setup TimeAxioms · 2025
- Research on Intelligent Manufacturing Production Line Scheduling Optimization Based on Improved Gray Wolf Optimization AlgorithmInternational Journal of Intelligent Systems · 2026
- A Job Shop Scheduling Model Based on a Fuzzy Induction Strategy and Balanced Search MechanismSystems · 2026