An improved whale optimization algorithm for flexible job shop scheduling problems with machine deterioration effects
Kun Li, Silong Tian
Tiangong University
Key points
From the paper's conclusion- Targeting the characteristics of performance degradation caused by prolonged machine operation in real production, this article examines the flexible job shop scheduling problem under machine deterioration effects, develops the FJSP-MDE mathematical model to minimize makespan, and presents an Improved Whale Optimization Algorithm (IWOA) to solve the problem.
Abstract
Targeting the characteristics of performance degradation caused by prolonged machine operation in real production, this article examines the flexible job shop scheduling problem under machine deterioration effects, develops the FJSP-MDE mathematical model to minimize makespan, and presents an Improved Whale Optimization Algorithm (IWOA) to solve the problem. The algorithm employs a hybrid population initialization strategy to generate high-quality initial solutions during the initialization phase. Nonlinear convergence factors and inertia weighting strategies are designed to balance global search and local exploitation capabilities. Stochastic differential variance and golden sinusoidal strategies are designed to enhance population diversity and expand the search range. Finally, the feasibility and effectiveness of the IWOA algorithm are proved by simulation experiments.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Multi-Strategy Enhanced White Shark Optimizer for Solving Job Shop Scheduling ProblemBiomimetics · 2026
- Hybrid Grey Wolf Optimizer with discrete prism dispersion strategy for solving flexible job-shop scheduling problemScientific Reports · 2026
- An Improved MOEA/D Algorithm for Multi-Objective Green Flexible Job Shop Scheduling ProblemProcesses · 2026
- Research on the Flexible Job Shop Scheduling Problem with Job Priorities Considering Transportation Time and Setup TimeAxioms · 2025
- Solving Multi-Objective Flexible Job Shop Scheduling Problem to Achieve Sustainable ManufacturingSustainability · 2026
- Research on Intelligent Manufacturing Production Line Scheduling Optimization Based on Improved Gray Wolf Optimization AlgorithmInternational Journal of Intelligent Systems · 2026