Integrating Constructability and Quality Monitoring in 4D BIM: A Shipyard Case Study
Mohamad Asuha Sacdan, Nur Yasmin Qashrina Suzaini, Nurul Noraziemah Mohd Pauzi
Key points
From the paper's conclusion- This study proposes an integrated 4D BIM workflow that combines constructability evaluation and quality monitoring within a unified process.
Abstract
Shipyard construction projects are characterized by high complexity, tight scheduling constraints, and fragmented coordination between design, planning, and quality control processes. While 4D Building Information Modelling (4D BIM) has been widely adopted for visualization and scheduling, its integration with constructability assessment and quality monitoring remains limited in practice. This study proposes an integrated 4D BIM workflow that combines constructability evaluation and quality monitoring within a unified process. The workflow was developed based on expert interviews and project documentation analysis, and incorporates commonly used industry tools, including Synchro Pro, Autodesk Navisworks, and Primavera P6, to ensure practical applicability. The proposed workflow was applied to a floating liquefied natural gas (FLNG 3) shipyard project to evaluate its feasibility. The results demonstrate that the workflow enhances coordination between design and scheduling, improves visibility of construction sequences, and supports early identification of constructability and quality-related issues. It also enables a more proactive approach to quality management through continuous monitoring within the 4D BIM environment. The case study validation identified 17 constructability assessment review items and 12 areas for improvement, including model completeness issues, clash detection findings, missing schedule activities, and activity breakdown limitations. The key contribution of this study is the integration of constructability and quality monitoring checkpoints into a unified 4D BIM workflow tailored to shipyard construction, while offering adaptable principles for other industrial construction sectors.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- A Closed-Loop Digital QA/QC Framework for Mega Construction Projects: Integrating BIM, Reality Capture, AI and Enterprise SystemsBuildings · 2026
- Developing a framework for integrating value management and total quality management in construction projects: a systematic literature review with narrative synthesisFrontiers in Built Environment · 2026
- Integrated Lean–BIM–AI Frameworks for Construction Quality and Sustainable Performance: A Systematic ReviewBuildings · 2026
- Can Digital Construction Verify Circularity? A Systematic Review of BIM- and LCA-Based Decision FrameworksSustainability · 2026
- An Integrated Quality Assurance, Quality Control, and Geotechnical Compliance Framework for Large-Scale Urban Infrastructure ProjectsSaudi Journal of Engineering and Technology · 2026
- A novel BIM-AI-based framework towards data-driven value engineering optimization for circular economy in constructionInternational Journal of Building Pathology and Adaptation · 2026