A Closed-Loop Digital QA/QC Framework for Mega Construction Projects: Integrating BIM, Reality Capture, AI and Enterprise Systems
Can Aksak, Mehmet Sakin
Hasan Kalyoncu University
Key points
From the paper's conclusion- By treating integration as the primary design objective, the framework provides a foundation for enterprise-wide digital quality management, lifecycle information continuity and digital-twin readiness in mega construction projects.
Abstract
Quality management in mega construction projects is increasingly supported by digital technologies, yet quality information often remains fragmented across inspection systems, reality-capture platforms, Building Information Modelling (BIM) environments and enterprise systems. This fragmentation limits traceability, delays corrective actions and weakens the connection between quality performance, contractual obligations and financial accountability. This study develops a closed-loop digital QA/QC framework that integrates BIM, mobile field inspection, reality capture, artificial intelligence (AI) augmentation and enterprise resource planning (ERP) within a unified governance architecture. Following a Design Science Research approach, the study proposes a seven-layer framework linking quality events to procurement, financial control, and project-management processes while supporting role-based decision-making through data democratisation mechanisms. The framework extends conventional ERP-enabled quality management by explicitly incorporating procurement (MM) and financial-control (FI/CO) functions, including supplier-quality management, cost-of-poor-quality tracking and quality-linked payment governance. An illustrative project scenario and sensitivity analysis are used to demonstrate the application of the proposed KPI and evaluation structure. By treating integration as the primary design objective, the framework provides a foundation for enterprise-wide digital quality management, lifecycle information continuity and digital-twin readiness in mega construction projects. The contribution itself is evaluated through an illustrative Design Science Research demonstration and an assumption-bounded sensitivity analysis rather than through field data, with future empirical validation specified through a controlled before-and-after case-study protocol.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Developing a framework for integrating value management and total quality management in construction projects: a systematic literature review with narrative synthesisFrontiers in Built Environment · 2026
- Integrated Lean–BIM–AI Frameworks for Construction Quality and Sustainable Performance: A Systematic ReviewBuildings · 2026
- Advancements in Digital Twin Applications for Intelligent Construction Quality ManagementJournal of Construction Engineering and Management · 2025
- An Integrated Quality Assurance, Quality Control, and Geotechnical Compliance Framework for Large-Scale Urban Infrastructure ProjectsSaudi Journal of Engineering and Technology · 2026
- Can Digital Construction Verify Circularity? A Systematic Review of BIM- and LCA-Based Decision FrameworksSustainability · 2026
- Digital Disruption in Construction: The Future of Automated Structural Quality InspectionsIOP Conference Series: Earth and Environmental Science · 2026