Construction effectiveness and safety improvement with project scheduling addressing Lean principles
Marco A. Bragadin, Benedetta Balzani, Davide Coccolini
Key points
From the paper's conclusion- Construction scheduling indicates the sequence of activities, therefore it can be used to eliminate safety risk interactions among activities, time – space clashes between contemporary activities.
Abstract
Enhancing production effectiveness and safety of construction projects is one of the most difficult tasks for a project scheduler. The application of Precedence Diagramming Method technique to optimize a project schedule can lead to reduction of total duration thus improving project effectiveness. Besides, minimization of total project duration has always been the aim of networking techniques, but their implementation in construction has been criticized, and many improved methods have been proposed as Location Based Management System and Takt Planning. Nevertheless, networking techniques are still most used scheduling methods for project control. Construction is an high hazard industry, therefore Occupational Safety and Health provisions are of paramount importance. Construction scheduling indicates the sequence of activities, therefore it can be used to eliminate safety risk interactions among activities, time – space clashes between contemporary activities. The proposed approach use Precedence diagramming and a Location Breakdown Structure to eliminate possible interference hazards while supporting process flow detection into single location. The calculation of activity times is the traditional CPM algorithm that has the aim of finding the minimum total project duration. A takt plan is created to visualize the project development and manually optimize both process flow and safety. Safety buffers are inserted mainly on subcritical path thus using activity floats to limit delay of project completion. The process is performed iteratively, until detected time-space hazards are eliminated. An actual case study of building renovation is presented for a sample testing of the approach, that demonstrate the feasibility of the proposed approach. Time – space clashes are avoided, with limited delay of total project duration.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- An Integrated ML-Lean-BIM framework for prediction of construction duration in metro projectIOP Conference Series: Earth and Environmental Science · 2026
- Implementing Lean Construction Principles in Civil Infrastructure Projects: An Analytical Framework for Productivity Enhancement and Waste EliminationBuildings · 2026
- Lean construction and BIM in construction projects: A literature review (2015–2025)Organization, Technology and Management in Construction: an International Journal · 2026
- Risk prioritization in construction projects as a governance problem: a hierarchical, explainable, and uncertainty-aware decision frameworkInternational Journal of Construction Management · 2026
- Modeling spatiotemporal hazard dynamics for construction safety using graph attention networksJournal of Engineering Design and Technology · 2026
- The 3-Tier Integrated Technology Risk Model for Occupational Safety and HealtharXiv · 2026