Interpreting risk drift in construction projects: a fuzzy–Bayesian decision framework for weak signal–based governance
Sachin Admane, Tejas Admane
Canadian Institutes of Health Research · Japan Society for the Promotion of Science London
Key points
From the paper's conclusion- The results show that sustained marginal conditions can erode confidence in safe operation without triggering conventional alarms, highlighting limitations of threshold-based risk logic.
Abstract
Construction project risks rarely materialize through sudden threshold breaches; instead, they tend to evolve gradually as weak and ambiguous signals accumulate under persistent delivery pressure. Conventional construction risk management systems, which rely on discrete indicators and fixed escalation rules, remain poorly suited to recognizing this form of gradual confidence erosion, commonly described as risk drift. This study develops a decision-oriented fuzzy–Bayesian framework to operationalize risk drift as an evolving belief about project safety rather than as a static or predictive risk state. Fuzzy logic is used to translate heterogeneous monitoring indicators into interpretable linguistic concern levels, preserving ambiguity inherent in early warning signals, while Bayesian updating accumulates these concerns over time to represent progressive belief change. The framework is illustrated using a publicly available integrated construction monitoring dataset to demonstrate how risk drift can emerge even when individual indicators remain within acceptable ranges. The results show that sustained marginal conditions can erode confidence in safe operation without triggering conventional alarms, highlighting limitations of threshold-based risk logic. By reframing risk as a belief-based governance construct, the proposed approach supports earlier, proportionate, and precautionary managerial intervention using existing project data, without reliance on complex prediction models or rigid escalation thresholds.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Inferring latent system risk in interdependent construction systems using digital twinsConstruction Innovation · 2026
- Risk prioritization in construction projects as a governance problem: a hierarchical, explainable, and uncertainty-aware decision frameworkInternational Journal of Construction Management · 2026
- A BIM‐Based Probabilistic Approach for Risk Assessment in Construction ProjectsAdvances in Civil Engineering · 2026
- Assessing the impact of AI-enabled BIM digital twins on construction risks: a Bayesian Network of Jordanian expert beliefs.Frontiers in artificial intelligence · 2026
- Vision-Guided Dynamic Risk Assessment for Long-Span PC Continuous Rigid-Frame Bridge Construction Through DEMATEL–ISM–DBN ModellingBuildings · 2025
- A Quantitative Risk Evaluation Method for Emitter Clogging Integrating Fuzzy Comprehensive Evaluation and Dynamic Bayesian Network (FCE‐DBN)Irrigation and Drainage · 2026