Information Utilization Strategies Integration-Enhanced Rule Decision Framework for Rule-Based Real-Time Scheduling in Make-to-Order Flexible Job Shops
Xin Chen, Shuo Zhu, Zhigang Jiang, Jie Yang, Yanan Wang
Key points
From the paper's conclusion- A sequence-then-assign (S-T-A) decision framework is developed to reorganize the timing and order of rule decisions, allowing predictive information on subsequent operations to be incorporated into the real-time decision scope.
Abstract
In make-to-order (MTO) flexible job shops, frequent and dynamic job arrivals place stringent demands on the real-time responsiveness of scheduling systems. Dispatching rules are widely used in real-time scheduling because they can generate decisions within milliseconds, but their performance depends strongly on how information is utilized at decision time. Using more up-to-date job shop information improves information timeliness, whereas incorporating information on the predictable release times of subsequent operations of unfinished jobs improves information completeness. However, the conventional assign-then-sequence (A-T-S) decision framework fixes machine-assignment decisions too early, making it difficult to combine forward-looking reservation with real-time revision. This paper proposes an information-utilization-enhanced rule decision framework for MTO flexible job shops. A sequence-then-assign (S-T-A) decision framework is developed to reorganize the timing and order of rule decisions, allowing predictive information on subsequent operations to be incorporated into the real-time decision scope. Because such forward-looking reservation may create machine idleness, a gap-filling mechanism is introduced to insert other processable operations into available idle intervals. Moreover, since the expanded information scope enlarges the rule element set and search space, multiple crossover operators are embedded in a gene expression programming (GEP) based rule-mining procedure to improve rule quality and search efficiency. Simulation experiments under six shop configurations show that the proposed framework achieves the lowest best-found and mean makespan values in all scenarios. In terms of mean makespan, the proposed framework reduces the value by 2.09–5.87% relative to the timeliness-enhancement-only variant and by 6.35–9.82% relative to the completeness-enhancement-only variant.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Fragment-Free Constraint Programming for the Preemptive Flexible Job Shop Scheduling ProblemarXiv · 2026
- A neural-driven constructive heuristic for the flexible job shop scheduling problem: An efficient alternative to complex deep learning methodsComputers & Operations Research · 2026
- A multi-critical-path co-driven evolutionary algorithm addressing the dual-resource flexible job shop scheduling problem with offline operations and job priority constraintsInternational Journal of Production Research · 2025
- A matheuristic and imitation learning-driven evolutionary algorithm for the flexible job shop scheduling benchmark problem with discrete operation sequence flexibilityInternational Journal of Production Research · 2026
- Customizable GenAI system for assisting job scheduling in a flexible manufacturing system consisting of multiple factoriesThe International Journal of Advanced Manufacturing Technology · 2025
- APEX: An Extensible Model for Agent-Assisted Production SchedulingarXiv · 2026