Multiobjective optimization model for project time and cost management under multiperiod financial constraints
Nima Amani
Key points
From the paper's conclusion- This mathematical agreement demonstrates the performance, precision, and structural reliability of the calibrated metaheuristic when navigating complex project networks under multi-period financial constraints.
Abstract
This study introduces a novel mathematical formulation for the multi-mode project scheduling problem that concurrently optimizes project duration and total direct cost under strict periodic budget constraints. To navigate the highly non-linear, combinatorial decision space inherent in this framework, a multi-objective evolutionary metaheuristic is developed to systematically map the non-dominated Pareto-optimal frontier. The practical efficacy and algorithmic accuracy of this proposed methodology are validated using an empirical case study centered on a flooring installation network within a large-scale government building infrastructure project. To establish a rigorous validation benchmark, the frontier solutions derived from the genetic metaheuristic were evaluated against an exact global optimization baseline generated via the GAMS (General Algebraic Modeling System). The multi-objective optimization model successfully identifies a robust baseline Pareto-optimal project duration of 64 working days. Comprehensive sensitivity analysis indicates that while an increase in capital allocation generally compresses project timelines by facilitating resource-intensive execution modes, this relationship is bound by distinct financial and physical plateaus. Additional schedule compression to 63 and 62 working days is conditionally achievable only when periodic financial boundaries are extended to their maximum upper limits. At this threshold, exact mathematical validation uncovers the absolute physical limit of the construction network, beyond which further budget injections yield diminishing returns regarding duration reduction. Crucially, the trade-off configurations generated by the non-dominated sorting genetic algorithm display a strong convergence profile, aligning closely with the global optima produced by the exact GAMS solver. This mathematical agreement demonstrates the performance, precision, and structural reliability of the calibrated metaheuristic when navigating complex project networks under multi-period financial constraints. Ultimately, this framework provides project managers and public procurement authorities with a highly practical decision-support tool capable of balancing tight delivery timelines and implementation expenditures within predefined, real-world fiscal boundaries.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Project Scheduling to Minimize the Time and Cost in Large-Scale Construction Projects with Repulsion-Based Improved Arithmetic OptimizationJournal of Construction Engineering and Management · 2025
- Integrated capacity planning and multi-project scheduling considering resource transfer and idlenessInternational Journal of Production Research · 2025
- MODIFIED ADAPTIVE WEIGHT RAO-3 ALGORITHM FOR CONSTRUCTION TIME-COST TRADE-OFF OPTIMIZATION PROBLEMSEskişehir Osmangazi Üniversitesi mühendislik ve mimarlık fakültesi dergisi :/Osmangazi Üniversitesi Mühendislik-Mimarlık Fakültesi dergisi · 2025
- An Uncertainty‐Aware Digital Twin Framework for Dynamic Cost Prediction and Decision Optimization in Transmission Engineering ProjectsEngineering Reports · 2026
- Genetic Programming for Dynamic Resource Allocation in Construction Projects: A Simulation-Based Case StudyApplied Sciences · 2026
- An integrated fuzzy multi-criteria decision making and mixed-integer linear programming optimization framework for project risk assessment and response strategy selection: A case study of a liquefied petroleum gas pipeline construction project.PloS one · 2026