Optimizing Flexibility and Commitments: Partially-Adaptive Multi-Stage Matrix Assembly Layout Design Problem
Baturhan Bayraktar, Merve Bodur, Martin Grunow, Rainer Kolisch
Key points
From the paper's conclusion- We introduce the layout revision timing problem, jointly choosing revision points and committed layout sequences under demand uncertainty while production adapts within those layouts.
Abstract
Matrix assembly layouts provide manufacturing flexibility under product variety and demand volatility through locally reconfigurable production stations. Periodic redesign exploits this flexibility, yet existing models allow only annual revisions. Finer calendars expose a flexibility-commitment trade-off: advance layout commitments support coordination, supplier agreements, and discounts. We introduce the layout revision timing problem, jointly choosing revision points and committed layout sequences under demand uncertainty while production adapts within those layouts. We formulate it as a partially adaptive multistage stochastic program with two complementary extensions. Our cost-based extension places the economic value of advance commitment in the objective rather than prescribing revision budgets; our scenario-adaptive extension adapts revision timing to revealed information. For station-use minimization, we establish a cost decomposition across commitment intervals, yielding an exact dynamic program that reuses station subproblem solutions across model variants and parameter settings. As a more general alternative, we develop an integer L-shaped method strengthened by monotonicity-based cuts for budgeted formulations and enhanced cuts exploiting this decomposition. On automotive instances, including scenario trees with nearly 10,000 nodes, our combined model's average savings in expected station-use cost at the base-case discount reach 4.99% versus full adaptivity and 28.65% versus full commitment. Scenario adaptivity is most valuable when demand paths diverge and discounts justify commitment on some paths but not others, as in electrification-driven scenarios.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Network Flexibility Design Under Endogenous UncertaintyarXiv · 2026
- Monolithic Encoding for Matrix System Layout Optimization: From Nested to Single-Loop SearchMachines · 2026
- Multistage Production–Quality–Maintenance Optimization Under Uncertain Quality-Deviation Propagation: A K-Adaptability ApproachProcesses · 2026
- Development of a capability-based scheduling heuristic for matrix production systemsProduction Engineering · 2026
- Matrix-structured manufacturing systems: integrated planning of design and material supplyInternational Journal of Production Research · 2026
- An adaptive lexicographic MILP approach for cut order planningInternational Transactions in Operational Research · 2026