Key points
From the paper's conclusion- By following best practices for planning, material selection, installation, and quality control, water utilities can improve long‐term performance and get the most value from their lead service line replacement investments.
Abstract
By following best practices for planning, material selection, installation, and quality control, water utilities can improve long‐term performance and get the most value from their lead service line replacement investments.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Material Selection Method Based on Health, Reliability and Cost for Water Supply PipeF1000Research · 2026
- Retrospective Evaluation of Capital Improvement Program Planning EffectivenessJournal AWWA · 2026
- Integrating manufacturing and reverse logistics practices to enhance sustainability performance: evidence from a large manufacturing contextInternational Journal of Productivity and Performance Management · 2026
- Optimal Maintenance Time for Water Distribution Systems Considering Deterioration Rate and Maintenance CostsWater · 2026
- Designing Building Water Systems to Better Manage LegionellaJournal AWWA · 2026
- A comprehensive suitability assessment framework for low impact development (LID) incorporating life-cycle carbon benefits: A case study in Wuhan, ChinaJournal of Hydrology Regional Studies · 2026