Retrospective Evaluation of Capital Improvement Program Planning Effectiveness
Alence Poudel
Key points
From the paper's conclusion- The choice of planning method has measurable consequences for system reliability and ratepayer value.
Abstract
US water utilities spend billions annually on capital improvement programs (CIP). Few utilities examine whether their prioritization method improves long‐term system reliability or aligns with real‐world failure outcomes. In a study of City of Sugar Land, Texas, that examined the 2018–2025 era, five planning methods yielded meaningfully different results when tested against 321 unique main breaks. These methods included Weibull failure‐probability‐based, conditional‐survival‐based, and traditional risk‐scoring models; and two machine learning models. The choice of planning method has measurable consequences for system reliability and ratepayer value.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Intelligent Water Distribution Systems: Emerging Tools for Performance ImprovementWater · 2026
- Methodology for Developing a Maintenance Action Program for Power Units of Captive Power Plants Based on an Integrated Priority IndicatorEnergies · 2026
- Optimal Maintenance Time for Water Distribution Systems Considering Deterioration Rate and Maintenance CostsWater · 2026
- Asset-Normalized Distribution Reliability Budget Optimization Using Historical Outage Benefits and Work-Type LearningarXiv · 2026
- A simulation-based failure classification method for water distribution systemsAdvances in Science and Technology – Research Journal · 2026
- Network-aware deterioration risk and renewal prioritization for aging urban sewers: a gis-based simulation framework applied to Nam-gu, Ulsan, South KoreaStochastic Environmental Research and Risk Assessment · 2026