Stranded Compute in AI Inference Workloads: Recovering Value Through Demand Aggregation
Sam Kingsley
Key points
From the paper's conclusion- Modelling reserve and idle capacity as diversifiable risk, pooling demand across eight imperfectly correlated tenants (rho = 0.3) recovers 7.3 pp of goodput, approximately $0.75M per annum per megawatt of IT capacity, or between 2.8x and 4.9x the entire annual interconnection spend of the deployment that produced it.
Abstract
AI inference infrastructure is commonly analyzed as an energy business. Under full total cost accounting it is not: in the reference deployment modeled here, capital recovery is 87.3% of fully loaded cost per token and electricity 3.7%. Because capital accrues per unit time irrespective of use, accelerator value is destroyed by non-utilization rather than by consumption. Yet, SLO qualified goodput reaches only 59.6% of nameplate throughput, and the decomposition of the loss chain shows that 25.2 of the 40.4 lost percentage points arise from scheduling idleness and stranded burst reserve. Both are properties of a tenant's demand portfolio rather than of its silicon, and neither is diversifiable by a single tenant acting alone. Modelling reserve and idle capacity as diversifiable risk, pooling demand across eight imperfectly correlated tenants (rho = 0.3) recovers 7.3 pp of goodput, approximately $0.75M per annum per megawatt of IT capacity, or between 2.8x and 4.9x the entire annual interconnection spend of the deployment that produced it. The implication for neutral colocation and interconnection providers is that the switching and interconnection layer aggregating tenant demand functions as an instrument of capital productivity while being priced as transport.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Spot Markets for AI Inference: Dynamic Capacity Allocation and Pricing on a Shared Accelerator FleetarXiv · 2026
- Token-as-a-Utility: A Model-Agnostic Architecture for Metering and Provisioning AI Inference ServicesarXiv · 2026
- AI Inference-Aware Optimal Power Flow: Converting Token Requirements into Grid FlexibilityarXiv · 2026
- Capital Efficiency, Isolation, Risk, and Ruin in Generative AI Inference Serving InfrastructurearXiv · 2026
- Data center workload flexibility for power system demand response: Evidence from Alibaba tracesInternational Journal of Electrical Power & Energy Systems · 2026
- Scaling Shapley Energy Attribution to Large LLM BatchesarXiv · 2026