Data Center-Aware Load Pickup in Power System Restoration
Yousef Abudyak, Saleh Sadeghi Gougheri, Mohsen Alizadeh, Wei Sun
Key points
From the paper's conclusion- Phasor-domain simulations of a low-inertia restoration scenario show that the method serves 760 MW of load outside the data centers and satisfies all tested operating limits.
Abstract
Data centers requiring continuous operation rely on onsite generation and battery storage during blackouts. Their return to grid supply must be coordinated with the restoration of other loads because demand fluctuations can affect system frequency. This paper adds constraints to a restoration optimization problem that coordinates load pickup, grid supply to data centers, onsite generation, and battery operation. These constraints reserve battery power and energy to accommodate bounded demand changes while maintaining approved grid supply to data centers. The method accounts for processing delays and checks resource limits using updated operating states before applying commands. Phasor-domain simulations of a low-inertia restoration scenario show that the method serves 760 MW of load outside the data centers and satisfies all tested operating limits. Nominal and frequency-aware benchmarks serve 840 MW and 800 MW, respectively, but violate operating limits.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Data Center Oscillation Isolation and Grid Support: Fundamental Limits and Source-Selective ControlarXiv · 2026
- Strengthening Data Center Operations Using Grid-Forming Battery Energy Storage as a Line-Interactive Uninterruptible Power SupplyInternational Journal of Electrical Power & Energy Systems · 2026
- A Dynamic Model and Stability Analysis of a Grid-Interactive Data CenterarXiv · 2026
- Assessing Data Center Hosting Capacity Considering Electromagnetic Transient DynamicsarXiv · 2026
- Which Data-Center Load Models Can Be Trusted? An Evidence-Graded Review of Dynamic Modeling and Validation for Large Computational LoadsarXiv · 2026
- Reducing Data-Center Load Transfers with Ride-Through-Aware Voltage ControlarXiv · 2026