Below Three: A 2.8027-Approximation for Moldable Precedence Scheduling
Klaus Jansen, Felix Ohnesorge
Key points
From the paper's conclusion- We give a deterministic polynomial-time $2.8027$-approximation for the full convex model and every number of processors.
Abstract
We study makespan minimisation for nonpreemptive moldable jobs with arbitrary precedence constraints on identical processors. Each job runs on a chosen number of processors that remains fixed throughout its execution. Allocating more processors to a job can shorten its execution, but may increase total work and delay other jobs. We assume nonincreasing processing times, nondecreasing work, and a convex duration--work relation after dominated allocations are removed. This model includes jobs with concave speedup, for which Jansen and Zhang obtained a $3.291919\ldots$-approximation. Independently and concurrently with our work, Chen obtained a $3.016208\ldots$-approximation for the full convex model and a $2.973912\ldots$-approximation for concave speedup. We give a deterministic polynomial-time $2.8027$-approximation for the full convex model and every number of processors. Our result breaks the factor-three barrier for this model and also improves the approximation guarantee for concave speedup.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Speedup-Aware Rounding for Scheduling Malleable Tasks with Precedence ConstraintsarXiv · 2026
- Contiguous Monotone Moldable Job SchedulingarXiv · 2026
- Near-optimal universal scheduling for moldable tasks: the Fair algorithmJournal of Scheduling · 2026
- Minimizing the Makespan Approximately on Two Identical Parallel Machines with a Loading--Unloading ServerarXiv · 2026
- A QPTAS for Stochastic Scheduling of Bernoulli JobsarXiv · 2026
- Diverse Schedules for Makespan Minimization on Unrelated MachinesarXiv · 2026