A QPTAS for Stochastic Scheduling of Bernoulli Jobs
Junho Hwang
Key points
From the paper's conclusion- We study the classical problem of scheduling jobs with random processing times on $m$ identical machines to minimize the expected sum of completion times, for Bernoulli jobs: job $j$ takes time $p_j$ with probability $q_j$ and time $0$ otherwise, and its outcome is revealed when it starts.
Abstract
We study the classical problem of scheduling jobs with random processing times on $m$ identical machines to minimize the expected sum of completion times, for Bernoulli jobs: job $j$ takes time $p_j$ with probability $q_j$ and time $0$ otherwise, and its outcome is revealed when it starts. The benchmark is an optimal adaptive policy. We give a quasi-polynomial-time approximation scheme for every number of machines. Previously, quasi-polynomial time was known to give an $O(\log N)$-approximation, and approximation schemes were known only for a constant number of distinct sizes. The scheme rests on a simple observation: it suffices to round the times at which machines become free, rather than the times at which jobs start, to a grid whose width is proportional to the job size, and an optimal policy stretched by a factor close to one already respects such grids. We also show that every policy that fixes the order of the jobs in advance loses a factor $\Omega(\log N)$, already on two machines, so a constant factor requires adapting the order to the observed outcomes. Further results include a polynomial-time adaptive rule with ratio $\min\{m,1+\sum_j q_j\}$, a simpler approximation scheme for a constant number of sizes, and #P-hardness of computing the optimal expected cost on two machines.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Sharp Bounds for Truthful-in-Expectation SchedulingarXiv · 2026
- Approximation algorithms for identical parallel machine scheduling with assignment costsarXiv · 2026
- Via a New LP Relaxation: Stronger Performance Guarantees for WSEPT, and an LP-Based Proof of Kawaguchi & KyanarXiv · 2026
- Cross-Shift Analysis for Unrelated-Machine Weighted Completion Time A (1.3168+epsilon)-ApproximationarXiv · 2026
- The Exact Robustness of Smith's Rule with Predicted Processing TimesarXiv · 2026
- Speed-Robust Scheduling for Total Completion TimearXiv · 2026