Dynamic and Risk-Aware Procurement of Fast Frequency Response from Electric Vehicles and Heat Pumps
Savvas Panagi, Fanourios Kourougianni, Andreas Olympios, Chrysovalantis Spanias, Petros Aristidou
Key points
From the paper's conclusion- On the aggregator side, a risk-aware, TSO-certifiable bidding strategy quantifies reliable FFR capacity from fleets of electric vehicles (EVs) and heat pumps (HPs) by offering lower conditional quantiles of day-ahead headroom at a prescribed delivery reliability.
Abstract
Low-inertia power systems increasingly rely on Fast Frequency Response (FFR) to keep the frequency nadir above under-frequency load-shedding thresholds without oversized Frequency Containment Reserve or synchronous inertia. This paper proposes two complementary methodologies that interface with an existing day-ahead FFR capacity market. On the Transmission System Operator (TSO) side, a dynamic procurement rule maps forecasted kinetic energy and contingency magnitude onto an offline neighborhood-need surface, yielding interval-wise FFR capacity requests rather than constant seasonal or annual volumes. On the aggregator side, a risk-aware, TSO-certifiable bidding strategy quantifies reliable FFR capacity from fleets of electric vehicles (EVs) and heat pumps (HPs) by offering lower conditional quantiles of day-ahead headroom at a prescribed delivery reliability. The resulting requests and offers are cleared through a pay-as-bid capacity auction. A Cyprus 2025 case study shows that dynamic neighborhood-based procurement yields an annual clearing cost of about EUR 476,000, which is 30%-33% lower than the seasonal and annual static rules and also below the UFLS VoLL of EUR 637,500 estimated from the fifteen real 2025 events with fmin <= 49 Hz. EV and HP offers meet their target delivery reliabilities, and RMS validation finds 46 of 50 operating points above 49 Hz at both full and 85% FFR delivery.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Aggregation Model and Market Mechanism for Virtual Power Plant Participation in Inertia and Primary Frequency ResponseIEEE Transactions on Power Systems · 2025
- Frequency-Security-Aware Real-Time Economic Dispatch with Data Center UPS Flexibility for Inertia and Primary Frequency Response ServicesarXiv · 2026
- A Multi-Level Decomposition-Based Point–Interval Collaborative Forecasting Method for Frequency Regulation Capacity in Renewable-Energy-Integrated Power GridsEnergies · 2026
- A scenario-approach optimization with output-side uncertainty for frequency control with aggregated heat pumpsE3S Web of Conferences · 2026
- Optimal Configuration of Virtual Inertia and Fast Frequency Response in Low-Inertia Power SystemsEnergies · 2026
- Peak-suppressed net-load uncertainty modeling and coordinated EV-ESS flexibility for risk-aware dispatch in renewable-rich power systemsInternational Journal of Electrical Power & Energy Systems · 2026