AC Assessment of DC Power Flow Screening for Data Center Hosting Capacity and Siting
Haoxiang Wan, Jesus Silva-Rodriguez, Jonghwan Kwon, Xingpeng Li
Key points
From the paper's conclusion- A screening procedure based on direct current (DC) power flow estimates the data center hosting capacity of a candidate bus, termed the DC-screened capacity, and selects the generator commitment that supports it.
Abstract
A screening procedure based on direct current (DC) power flow estimates the data center hosting capacity of a candidate bus, termed the DC-screened capacity, and selects the generator commitment that supports it. This paper assesses that estimate under the alternating current (AC) network model. With the selected commitment fixed, an AC optimal power flow reoptimizes dispatch and voltages to find the largest data center load the bus can carry, termed the AC-assessed capacity. On a synthetic Texas system with 123 buses, the DC-screened capacity exceeds the AC-assessed capacity at 113 buses. Across all 123, the ratio of DC-screened to AC-assessed capacity has a median of 143% (a 43% overestimate) and a maximum of 1,070%. At these 113 buses, the DC-screened capacity violates a branch apparent power limit or a generator reactive power limit in the AC model, two limits the DC model omits. The overestimate changes decisions: a 1-GW project passes DC screening at every bus but exceeds the AC-assessed capacity at 37, and the bus ranked first by DC screening has 205.5 MW less AC-assessed capacity than the bus ranked second. Reporting the AC-assessed capacity beside each DC-screened capacity lets planners reject oversized projects or choose better sites.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Assessing Data Center Hosting Capacity Considering Electromagnetic Transient DynamicsarXiv · 2026
- N-1 Security constrained Hosting Capacity Assessment for Ultra Large-scale Data Center with Workload FlexibilityarXiv · 2026
- U.S. Data Center Growth Through 2030: A Critical Review of Grid Adequacy and Transmission Expansion PlanningarXiv · 2026
- Data Center Agglomeration and Power Infrastructure Capacity in the United StatesarXiv · 2026
- A Critical Review of Grid Integration Challenges and Flexibility Opportunities for Large-Scale Data CentersarXiv · 2026
- Dynamic Modeling of a Data Center for Power System Stability StudiesIEEE Transactions on Power Systems · 2025