Grid-Oriented Probabilistic Load Forecasting for AI Data Centers
Qingyi Yao, Ding Lin, Tianqiao Zhao, Meng Yue, Jianhui Wang
Key points
From the paper's conclusion- These findings show that marginal forecast quality alone is insufficient for operational decisions and motivate joint evaluation of calibration, temporal structure, and decision outcomes.
Abstract
Probabilistic load forecasts for AI data centers need to represent both uncertainty under changing workloads and temporal dependence to support grid operations. This paper develops an open, grid-oriented benchmark using measured GPU power from a 448-GPU AI cluster. Forecasts are evaluated through four stages: probabilistic prediction, online uncertainty calibration, temporal scenario generation, and horizon-wide reserve sizing. Following a change in cluster utilization, a quantile LightGBM forecast achieves only 63.4% coverage for a nominal 90% interval, while online regime-conditioned calibration increases coverage to 87.3%. Even with well-calibrated marginal forecasts, independent sampling produces unrealistic ramp distributions and excessive reserve procurement. Reconstructing temporal dependence from historical forecast errors reduces the discrepancy in ramp statistics and lowers realized reserve cost by 7.4-10.6% across three forecasting tasks. These findings show that marginal forecast quality alone is insufficient for operational decisions and motivate joint evaluation of calibration, temporal structure, and decision outcomes.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Thermal-Guided Ensemble Reinforcement Learning for Regime-Adaptive Short-Term GPU Power Forecasting in AI Data CentersarXiv · 2026
- Probabilistic electrical power demand forecasting with uncertainty quantificationarXiv · 2026
- Identifiability-Guided Composite Load Modeling of AI Data CentersarXiv · 2026
- Machine Learning for German Redispatch Forecasting under Data Delays and Temporal Distribution ShiftarXiv · 2026
- Grid Demand Flexibility Assessment of AI Data Centers via Batch Workload Temporal ShiftingarXiv · 2026
- Bridging the Information Gap: A Mechanism Design Approach to Forecasting AI’s Power Grid LoadEnergies · 2026