From the paper's conclusion
  • With weights of 0.55 for maximum temperature and 0.45 for duct length, the selected opening location was 5140.89 mm from the fan-side end of the trench.

Abstract

Cable trenches are widely used for power cable installation, and the location of a ventilation opening directly affects heat dissipation within the trench and the construction cost of the ventilation system. In current engineering practice, ventilation opening locations are often selected empirically, with limited support from quantitative decision-making methods, which leads to asymmetry in technical performance and economic efficiency. This study proposes a multi-objective optimization method for locating a cable trench ventilation opening that balances thermal performance and economic considerations. A three-dimensional finite element model coupling fluid flow and heat transfer was developed and integrated into a MATLAB–COMSOL co-simulation framework. The maximum temperature within the cable trench and the required ventilation duct length were minimized using MOBWO, based on which, 49 nondominated solutions were obtained. These solutions were ranked using the TOPSIS. With weights of 0.55 for maximum temperature and 0.45 for duct length, the selected opening location was 5140.89 mm from the fan-side end of the trench. An optimal result with maximum temperature of 47.24 °C and 514 cm of ventilation duct was yielded. Compared with the design of shortest-duct, this option reduced the maximum temperature by 18.48 °C and required an additional 414 cm of duct. Compared with the ventilation centered along the duct, it required 736 cm less duct, with a maximum temperature 7.33 °C higher. In the three-round comparison with MOPSO and NSGA-II, the MOBWO-based solution sets had the lowest IGD in every round. MOBWO also had the shortest mean runtime (431.94 min) and achieved a mean HV comparable to that of MOPSO. The TOPSIS weight sensitivity analysis showed that the opening location of 5140.89 mm remained the top-ranked choice at all tested temperature weights from 0.48 to 0.56. The proposed method provides a quantitative basis for designing cable trench ventilation layouts in electrical distribution rooms and similar applications.

Read the paper

Discussion

Science Skim's AI key points, plus readers' public thoughts

Readers' thoughts

No reader thoughts yet.

Related papers

Multi-Objective Optimization of the Ventilation Opening Location in a Cable Trench Considering Heat Dissipation and Duct Length — Science Skim