Multi-Objective Flexible Job Shop Scheduling Minimizing Makespan, Machine Workload, and Energy Consumption
Wenzhuo Meng, Yuanbin Mo
Key points
From the paper's conclusion- This study establishes a tri-objective model for the flexible job shop scheduling problem to minimize makespan, total machine workload, and energy consumption.
Abstract
This study establishes a tri-objective model for the flexible job shop scheduling problem to minimize makespan, total machine workload, and energy consumption. A multi-objective hiking optimization algorithm (MOHOA) is developed by combining good-point-set initialization, Cauchy mutation, and reference-point-based environmental selection. Its performance is evaluated on twelve benchmark functions and MK01–MK10 against six general multi-objective algorithms; a scheduling-specific HSGA adaptation is additionally evaluated on the MK instances. Statistical tests, ablation experiments, and mutation-probability sensitivity analysis are conducted to assess its performance. MOHOA achieves the best mean IGD and HV on ZDT1, ZDT2, and ZDT6 and ranks second overall on the benchmark functions. On the MK instances, it ranks second overall for both indicators and obtains the second-best mean IGD on five cases. Retaining the hiking update significantly improves IGD over Cauchy-only search on eight MK instances, supporting the contribution of the combined search mechanisms.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Solving Multi-Objective Flexible Job Shop Scheduling Problem to Achieve Sustainable ManufacturingSustainability · 2026
- KTNSGA-II: An Enhanced Hybrid Heuristic Algorithm for Multi-Objective Flexible Job Shop Scheduling with Makespan Workload Balance and Energy ConsumptionSymmetry · 2026
- An Improved MOEA/D Algorithm for Multi-Objective Green Flexible Job Shop Scheduling ProblemProcesses · 2026
- A Load-Aware NSGA-II with Hybrid Initialization and Closed-Loop Adaptive Operator Selection for Multiobjective Flexible Job Shop SchedulingElectronics · 2026
- Disentangling Objective-Specialised Local Search in Bi-Objective Energy-Aware Flexible Job Shop Scheduling: A Component-Wise Ablation StudyApplied Sciences · 2026
- Integrated Production and Maintenance Scheduling for Energy-Efficient Distributed Flexible Job Shops with Machine Degradation and Limited Maintenance ResourcesAlgorithms · 2026