Disentangling Objective-Specialised Local Search in Bi-Objective Energy-Aware Flexible Job Shop Scheduling: A Component-Wise Ablation Study
Sefa Aytuğ Çelik, Güray Yılmaz
Key points
From the paper's conclusion- We evaluated four variants on 14 fixed-sequence energy-aware flexible job shop scheduling (FJSP) instances using ten shared seeds, yielding 560 complete runs.
Abstract
Hybrid scheduling algorithms often make it difficult to determine which search component produces an improvement and how much computation it requires. We isolate critical-path (CP) and energy-aware (EA) local search within a common NSGA-II framework using a paired 2 × 2 ablation design. We evaluated four variants on 14 fixed-sequence energy-aware flexible job shop scheduling (FJSP) instances using ten shared seeds, yielding 560 complete runs. CP reduced minimum makespan on every benchmark (median reductions of 5.47% without EA and 3.68% with EA). EA reduced minimum total energy consumption, measured in proportional units, on every benchmark (0.94% without CP and 1.01% with CP). Both components broadly improved hypervolume and inverted generational distance, and the combined CP-then-EA treatment ranked first overall. These gains did not establish general component synergy under the prespecified ±2% interaction rule. Median runtime ratios relative to the baseline were 5.97, 23.56, and 29.81 for CP, EA, and CP+EA. Re-analysis of archived fronts showed stable quality rankings when the empirical reference was augmented with SPEA2 fronts. However, an alternative energy convention based on each machine’s operating window changed some energy rankings. The conclusions are therefore specific to the tested components, common generation budget, and energy model.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- KTNSGA-II: An Enhanced Hybrid Heuristic Algorithm for Multi-Objective Flexible Job Shop Scheduling with Makespan Workload Balance and Energy ConsumptionSymmetry · 2026
- An Improved MOEA/D Algorithm for Multi-Objective Green Flexible Job Shop Scheduling ProblemProcesses · 2026
- Multi-Objective Flexible Job Shop Scheduling Minimizing Makespan, Machine Workload, and Energy ConsumptionProcesses · 2026
- Energy‐aware scheduling in a flexible flow shop using a hybrid constraint programming approachInternational Transactions in Operational Research · 2026
- Knowledge-Guided Multi-Objective Evolutionary Algorithm for Energy-Efficient Integrated Process Planning and Scheduling with Variable Processing SpeedsMachines · 2026
- Solving Multi-Objective Flexible Job Shop Scheduling Problem to Achieve Sustainable ManufacturingSustainability · 2026