Stability Analysis and Enhancement of Grid-Following Offshore Wind Farms Integrated via Flexible Low-Frequency AC Transmission Considering Multi-Control-Loop Bandwidth Interaction
Yi Lu, Ziming Li, Jiachuan You, Yanxia Yao, Chao Ding, Xiaojun Ni, Jiaxing Lei
Key points
From the paper's conclusion- Power-step, weak-grid, bandwidth-sweep, and parameter-variation tests show that the proposed strategy, implemented solely through controller-parameter coordination without requiring additional hardware, suppresses oscillations, improves small-signal stability, and indicates a higher representative tested power-transfer boundary than PLL retuning at SCR = 1.50; 16 and 25 MW per turbine are the resp
Abstract
A flexible low-frequency AC transmission system (LFTS) can extend the AC export range of offshore wind farms, but interactions among converter control loops may restrict its stable operating region. This paper develops a unified small-signal model comprising a grid-following wind farm, low-frequency cable, modular multilevel matrix converter (M3C), and receiving grid. A matrix-valued generalized Nyquist return ratio, together with modal participation and parameter-sensitivity analyses, indicates that the approximately 30 Hz dominant mode is strongly associated with the coupled control and network dynamics involving the phase-locked loop, wind-farm outer loops, M3C low-frequency voltage control, and transmission network. Based on bandwidth separation, a coordination strategy is proposed to move the critical control dynamics away from the interaction region. Comparisons between the state-space model and MATLAB/Simulink R2023b time-domain simulations show local agreement at the tested operating points. Power-step, weak-grid, bandwidth-sweep, and parameter-variation tests show that the proposed strategy, implemented solely through controller-parameter coordination without requiring additional hardware, suppresses oscillations, improves small-signal stability, and indicates a higher representative tested power-transfer boundary than PLL retuning at SCR = 1.50; 16 and 25 MW per turbine are the respective instability test points.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Frequency Feature Transfer and Coordinated Control Algorithm for Offshore Wind MMC-HVDC Systems Based on DC Voltage FluctuationElectronics · 2026
- Analysis and suppression of high-frequency oscillation in wind farm-MMC-HVDC interconnected system considering distribution characteristics of submarine cablesInternational Journal of Electrical Power & Energy Systems · 2026
- Enhancing stability in renewable energy transmission using multi-terminal HVDC systems with grid-forming controls for offshore and onshore wind integrationScientific Reports · 2025
- Numerical Investigation of Floating Offshore Wind Turbine Motion and Mooring Responses in a Co-Located Wind–Wave System with a Shared Mooring LineSustainability · 2026
- High-Fidelity Cluster-Equivalent Modeling and Fast Deadband-Aware Active Power Control for Primary Frequency Support in Grid-Following Wind FarmsEnergies · 2026
- Research on hierarchical coordinated variable-gain frequency regulation strategy for wind farm MMC-LCC grid-connected systemInternational Journal of Electrical Power & Energy Systems · 2026