Probabilistic Lifecycle-Cost Assessment of Weathering-Steel Girder-End Protection Strategies
Sajan Shakya, Alexandra Hain, Kevin Zmetra
Key points
From the paper's conclusion- The findings demonstrate the importance of maintenance assumptions and of distinguishing mean cost from lowest-cost probability.
Abstract
Localized corrosion at weathering-steel girder ends near the bearings and deck joints can necessitate recurring maintenance and premature replacement. However, span-dependent comparisons of localized protection strategies under treatment-quantity, service-life, and economic uncertainties remain limited. This study develops a probabilistic lifecycle-cost framework comparing Paint + Replace, Paint + Repaint, Metalize + Remetalize, and preventive ultra-high-performance concrete (UHPC) encapsulation. A paired Monte Carlo analysis evaluated one million simple-span girders spanning 20–200 ft (6.1–61.0 m), with costs assessed at construction and after 75 and 150 years. Uncertainties in span, unit costs, paint service life, removal costs, and discount rates were incorporated. Outputs included mean lifecycle costs, distributions, lowest-cost probabilities, sensitivity analyses, and UHPC break-even thresholds. Assuming no future maintenance of the UHPC encasement or remaining paint, UHPC had the lowest mean cost in every span group at 75 and 150 years. At 150 years, its overall mean was $67.27k/girder, compared with $67.95k/girder for metalizing. Repainting the remaining painted region increased the UHPC mean to $68.54k/girder, placing it third. The findings demonstrate the importance of maintenance assumptions and of distinguishing mean cost from lowest-cost probability. The framework provides a basis for project-specific evaluation and comparison of girder-end protection strategies using locally calibrated inputs.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Machine Learning for Structural Steels: Materials Design, Property Prediction, Durability, and Future Directions.Materials (Basel, Switzerland) · 2026
- Structural Design, Environmental Impacts and Life-Cycle Costs of Alternative Cast-in-Place Motorway Tunnel Linings in the San Donato Case StudyInfrastructures · 2026
- Life Cycle Assessment and Life Cycle Cost Assessment of Prestressed Concrete Railway Sleepers: A 100-Year PerspectiveInfrastructures · 2026
- Impact-Induced Damage Localization and Post-Damage Electrochemical Response of Multilayer Protective Coatings on Carbon and Weathering SteelsCoatings · 2026
- Corrosion-fatigue degradation in reinforced concrete structures: A multiphysics phase-field modeling approachComputer Methods in Applied Mechanics and Engineering · 2026
- Life-cycle structural reliability of RC bridge piers under corrosion in a changing climatearXiv · 2026