Life Cycle Assessment and Life Cycle Cost Assessment of Prestressed Concrete Railway Sleepers: A 100-Year Perspective
Gennaro Riccio, Laura Moretti
Key points
From the paper's conclusion- This study investigates Life Cycle Assessment (LCA) and Life Cycle Cost Assessment (LCCA) to evaluate 1 km of RFI 260-VN prestressed concrete railway sleepers over a 100-year period.
Abstract
Railway infrastructure components have long service lives and require periodic maintenance and replacement, making their environmental and economic performance relevant from a life-cycle perspective. This study investigates Life Cycle Assessment (LCA) and Life Cycle Cost Assessment (LCCA) to evaluate 1 km of RFI 260-VN prestressed concrete railway sleepers over a 100-year period. The LCA follows ISO 14044 and EN 15804, while the LCCA follows ISO 15686-5 and considers discount rates of 1%, 3%, and 6%, together with a Project Evaluation and Review Technique (PERT)-based reference value. In the baseline scenario, the total climate change impact (GWP-t) is 588,835 kg CO2 eq./km, with the production stage accounting for 85.1% of the total. Non-renewable primary energy use (PENRE) is 5,830,475 MJ/km, compared with 229,859 MJ/km of renewable primary energy (PERE). The total life-cycle cost ranges from 2.35 million €/km ranges from €2.35 million/km at a 1% discount rate to 0.92 million €/km at 6%, with a PERT-based value of 1.40 million €/km. A sensitivity scenario was then developed by increasing the renewable share of the Italian residual electricity mix from 9.49% to 60%, while keeping electricity consumption unchanged. The modified mix reduces GWP-t to 588,555 kg CO2 eq./km (i.e., −0.05%) and in PENRE to 5,807,386 MJ/km (i.e., −0.40%), while increases PERE to 243,617 MJ/km (i.e., +5.99%). The additional cost associated with Guarantees of Origin remains below 1% of the total life-cycle cost. Overall, the results show that the environmental performance of the investigated sleeper system is primarily driven by material production, whereas modifying the foreground electricity mix produces marginal effects in total life-cycle impacts.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Rethinking railway sleepers: Exploring cleaner material solutions with geopolymers, acetylated wood, and recycled plasticsCleaner Engineering and Technology · 2026
- Life-cycle structural reliability of RC bridge piers under corrosion in a changing climatearXiv · 2026
- Life-Cycle-Assessment-Based Quantification and Low-Carbon Optimization of Carbon Emissions in Expressway ConstructionInfrastructures · 2025
- Structural Design, Environmental Impacts and Life-Cycle Costs of Alternative Cast-in-Place Motorway Tunnel Linings in the San Donato Case StudyInfrastructures · 2026
- Sustainable development of high-speed railway to green railway construction in China: practice, countermeasure and prospectsRailway Sciences · 2026
- Angewandte Ökobilanzierung im Tiefbau – Praxisinstrumente und ihre GrenzenBautechnik · 2026