科研速览 · Science Skim继续刷下去 · Keep skimming →
◆ Infrastructures2026-05-14· Cost overrun

Minimizing Cost Overrun in Rail Projects Through 5D-Bim: The Case Study of Victoria

Osama A. I. Hussain, Robert Moehler, Stuart D.C. Walsh, Dominic D. Ahiaga-Dagbui

原始摘要(英文原文)· Original abstract
This study evaluates the adoption and efficacy of the 5th Dimension Building Information Modelling (5D-BIM) as a cost dimension for mega rail projects, extending the discussion beyond just technological implementation to consider broader policy and practical implications. The purpose of this article is to understand the governance context of 5D-BIM implementation for rail and transport projects and evaluate the effectiveness of the 5D-BIM framework as currently applied by conducting semi-structured interviews with key stakeholders. Drawing on semi-structured interviews with 22 stakeholders across government, industry, and technology providers, the research examines current 5D-BIM practices. While the primary focus of the research is 5D BIM implementations within the state of Victoria, Australia, which is currently experiencing a surge in rail projects, interviews were also conducted with additional stakeholders from international rail projects for context. The findings reveal fragmented adoption, varying levels of organisational maturity, and significant policy and implementation gaps, particularly in the role of government as the primary client of transport infrastructure. The results of the interviews emphasise the centrality of government and regulatory context in driving the adoption and implementation of 5D-BIM as the primary client of transportation infrastructure and identify actionable recommendations for policymakers and practitioners towards a more integrated approach to 5D-BIM in mega rail projects. While 5D-BIM demonstrates clear benefits in enhancing cost estimation, coordination, and decision-making, its effectiveness is constrained by the absence of clear standards, limited BIM literacy, and inconsistent regulatory guidance. This study provides one of the first empirical validations of the 5D-BIM governance framework, demonstrating that its success is driven less by technological capability and more by policy alignment, standardisation, and institutional leadership.
读原文 · Read the paper ↗

AI 追问PRO

登录后使用 AI 追问

讨论区

登录后参与讨论

相关论文 · Related

Minimizing Cost Overrun in Rail Projects Through 5D-Bim: The Case Study of Victoria — 科研速览 Science Skim